You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. REMOVAL OF AUTOMOTIVE POLLUTANTS USING NEW METAL-SUPPORTED METAL CATALYST

    SBC: Accel Catalysis Inc.            Topic: N/A

    A NEW TECHNIQUE IS PROPOSED FOR THE PREPARATION OF METAL-SUPPORTED METAL (MSM) CATALYSTS. THE KEY FEATURE OF THIS TECHNIQUE INVOLVES THE PREPARATION OF A THIN LAYER OF POROUS METAL ON TOP OF A METAL SUBSTRATE SUCH THAT THE POROUS METAL SURFACE IS AN INTEGRAL PART OF THE METAL SUPPORT. SUBSEQUENT INTEGRATION OF PT AND RH ON THE POROUS METAL SURFACE WILL PRODUCE THE MSM CATALYST. THIS CATALYST IS US ...

    SBIR Phase I 1993 Environmental Protection Agency
  2. Manufacturing Methods for Sulfur Concrete Sewer Pipe

    SBC: Brimstone Pipe Company            Topic: N/A

    This Phase I research is intended to evaluate the feasibility of manufacturing low-cost, acid-resistant sanitary sewer pipe from sulfur concrete. Sulfur is an abundant mineral recovered from coking, natural gas processing, and petroleum refining. Secondary recovery of sulfur, resulting from environmental regulation, produces more material than is needed by U.S. industry. The U.S. Bureau of Mines ...

    SBIR Phase II 1998 Environmental Protection Agency
  3. USE OF INTEGRATED COMPUTER-AIDED SYSTEM ENGINEERING (I-CASE) TO DEVELOP NATINAL SOCIAL SERVICE INTEGRATED CASE MANAGEMENT INFORMATION SYSTEM

    SBC: A/s/k Associates            Topic: N/A

    USING A TIME TESTED, SUCCESSFULLY IMPLEMENTED COMPUTERIZED INTEGRATED CASE MANAGEMENT INFORMATION SYSTEM AS A BASE, WE WILL DESIGN AN INTEGRATED COMPUTER-AIDED SYSTEM ENGINEERING (I-CASE) TOOL, THAT WILL (A) BE READILY ACCEPTABLE TO A WIDE VARIETY OF CASE MANAGEMENT PROFESSIONALS NATION-WIDE (B) CAN EASILY BE ADAPTED TO ACCOMODATE DIFFERENCES BETWEEN AND WITHIN SERVICE AREAS NATION-WIDE, (C) CAN E ...

    SBIR Phase II 1993 Department of Health and Human Services
  4. An Optical Sensor for Monitoring Odors at Agricultural Livestock Facilities

    SBC: AeroSurvey, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1998 Department of Agriculture
  5. INFLATABLE SMART MISSILE WING DESIGN EVALUATION

    SBC: AEROTECH ENGINEERING & RESEARCH CORP.            Topic: N/A

    THREE AREAS OF ACTIVE MISSILE WING RESEARCH WILL BE PURSUED. THE FIRST SECTION WILL EVALUATE THE MATERIALS TO BE USED IN THE INFLATABLE WING SPARS, RIBS, SKINS, PRESSURE BLADDERS AND ACTIVE ELEMENTS. SPECIMENS OF HIGH ORTHOGONALITY COMPOSITES (POLYURETHANE-GRAPHITE) WILL BE CONSTRUCTED ALONG WITH SAMPLE ISOTROPIC BLADDER MATERIALS (MYLAR OR TEFLON) SO THAT THEIR FUNDAMENTAL PROPERTIES CAN BE EVALU ...

    SBIR Phase II 1993 Department of DefenseAir Force
  6. Affordability-driven, Microwave Curing for Reversible Bonding of Composites

    SBC: AEROTECH ENGINEERING & RESEARCH CORP.            Topic: N/A

    Fastening and joining technology has lagged behind the progress that has been made in other areas of composites for advanced air vehicles. Aerotech proposes the development of reversible polymeric adhesive bonding of composites using variable frequency microwave energy. With this method, composites are bonded using Poly Ether Ether Ketone (a high temperature thermoplastic) which is cured using v ...

    SBIR Phase II 1998 Department of DefenseAir Force
  7. STOCHASTIC MODELING OF ANTISYMMETRIC BUFFET LOADS ON HORIZONTAL STABILIZERS

    SBC: AEROTECH ENGINEERING & RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of Transportation
  8. GPS-Based Animal Control System

    SBC: AgriTech Electronics, L.C.            Topic: N/A

    This is a Phase II proposal to continue the work begun by AgriTech Electronics, LC (AgriTech) on a GPS-based livestock control system. This system will exclude animals from areas, or contain them within defined boundaries, where it is impractical or inefficient to build fence to achieve this objective. These needs arise in a variety of contexts, including the exclusion of livestock from riparian a ...

    SBIR Phase I 1998 Department of Agriculture
  9. Imaging Fractures and Fracture Systems to Assess Reservoir Properties

    SBC: ANALYTICAL MECHANICS ASSOCIATES, INC.            Topic: N/A

    50540-98-I Imaging Fractures and Fracture Systems to Assess Reservoir Properties--American Spectrum Engineering and Science Services, 5010 Grand Central Drive, Morgantown, WV 26505-4797; (304) 284-9144 Mr. William K. Overbey, Jr., Principal Investigator Mr. William K. Overbey Jr., Business Official DOE Grant No. DE-FG02-98ER82528 Amount: $74,694 Many fractured gas reservoirs could be produced ...

    SBIR Phase I 1998 Department of Energy
  10. Electro-magnetic Flak for Cruise and Sea Skimming Missile Defense

    SBC: Applied Physical Electronics, L.C.            Topic: N/A

    The electromagnetic directed energy method (lasers, particle beams, and high power microwaves) of defending against missiles relies on generating a large amount of energy at the defense site, locating the target, and then transporting a large fraction of that energy to the target along a line of sight at the speed of light, to either destroy or destabilize the threat at as long range as possibl ...

    SBIR Phase I 1998 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government