You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Imaging Fractures and Fracture Systems to Assess Reservoir Properties

    SBC: ANALYTICAL MECHANICS ASSOCIATES, INC.            Topic: N/A

    50540-98-I Imaging Fractures and Fracture Systems to Assess Reservoir Properties--American Spectrum Engineering and Science Services, 5010 Grand Central Drive, Morgantown, WV 26505-4797; (304) 284-9144 Mr. William K. Overbey, Jr., Principal Investigator Mr. William K. Overbey Jr., Business Official DOE Grant No. DE-FG02-98ER82528 Amount: $74,694 Many fractured gas reservoirs could be produced ...

    SBIR Phase I 1998 Department of Energy
  2. NATURAL GAS SELF-SUFFICIENCY THROUGH REGIONAL EFFORTS

    SBC: Engineering Decision Consult.            Topic: N/A

    BECAUSE OF ITS COMPLEXITY, THE STUDY OF THE NATION'S NATURALGAS SELF- SUFFICIENCY REQUIRES A REGIONAL APPROACH. BEFORE SELF-SUFFICIENCY CAN BE EMPIRICALLY ANALYZED, IT IS NECESSARY TO DELINEATE THE REGIONAL FACTORS INVOLVED. THE OBJECTIVE OF THIS RESEARCH IS TO ASSESS THE POTENTIAL FOR NATURAL GAS SELF-SUFFICIENCY ON A NATIONAL LEVEL THROUGH STATE AND REGIONAL SUCCESSES. THIS PROJECT WILL ASSESS T ...

    SBIR Phase I 1989 Department of Energy
  3. Absorption Chiller Corrosion Protection

    SBC: Rocky Research            Topic: N/A

    50131-98-I Absorption Chiller Corrosion Protection--Rocky Research, P.O. Box 61800, Boulder City, NV 89006-1800; (702) 293-0851 Dr. Travis Chandler, Principal Investigator Dr. Uwe Rockenfeller, Business Official DOE Grant No. DE-FG03-98ER82658 Amount: $75,000 Corrosion control is the main obstacle facing chiller manufacturers for the introduction of new designs of high efficiency lithium brom ...

    SBIR Phase I 1998 Department of Energy
  4. AN ADVANCED STAGING CONCEPT FOR HIGH COEFFICIENT OF PERFORMANCE SOLID-VAPOR HEAT-ACTIVATED COMPLEX-COMPOUND HEATPUMPS

    SBC: Rocky Research            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of Energy
US Flag An Official Website of the United States Government