You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 1 - 10 of 12055 results
  1. An Innovative, Java-Based Tool Suite for Visual Failure Management in Large-Scale, Complex, High Assurance Systems

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: N/A

    21st Century Systems, Inc. (2CSI, formed April 1996) proposes a tool suite which will combat architectural design errors in large-scale, high-assurance systems through systematic and intelligent simulation and modeling of alternate designs. The suite will feature a wide range failure analysis, identification, isolation, correction and management tools, and will make use of many innovative resourc ...

    SBIR Phase I 1998 Department of DefenseOffice of the Secretary of Defense
  2. High-Voltage, Fast Turn-on and Turn-off Diamond Switch

    SBC: ALAMEDA APPLIED SCIENCES CORPORATION            Topic: N/A

    51015-98-I High-Voltage, Fast Turn-on and Turn-off Diamond Switch--Alameda Applied Sciences Corp., 2235 Polvorosa Avenue, Suite 230, San Leandro, CA 94577-2249; (510) 483-4156 Dr. Rahul R. Prasad, Principal Investigator Dr. Mahadevan Krishnan, Business Official DOE Grant No. DE-FG03-98ER82524 Amount: $75,000 Improvements in failure rates and reliability of current gas switches used for particl ...

    SBIR Phase I 1998 Department of Energy
  3. Ultrafast Gas Curtain and Wire-Reinforced X-Ray Window Debris Shields

    SBC: ALAMEDA APPLIED SCIENCES CORPORATION            Topic: N/A

    Alameda Applied Sciences Corporation (AASC) proposes to develop two components of a three-component, survivable debris shield for large area test exposures to cold (1-5keV) x-rays. These elements also have commercial potential in accelerators and in radiography. The elements are: an ultrafast gas curtain designed to be located close to the x-ray source to deflect plasma debris as well as ~um siz ...

    SBIR Phase I 1998 Department of DefenseNational Geospatial-Intelligence Agency
  4. Optically Controlled, High Repetition Rate, High Power Diamond Switches

    SBC: ALAMEDA APPLIED SCIENCES CORPORATION            Topic: N/A

    Alameda Applied Sciences Corporation (AASC) proposes to develop a new type of trigger for a high voltage, high repetition rate diamond switch. AASC has previously developed diamond switches with electron beam triggers. These switches handle 10-20 kV voltage pulses with

    SBIR Phase I 1998 Department of DefenseMissile Defense Agency
  5. A Vacuum Arc Ion Source for Heavy Ion Fusion Applications

    SBC: ALAMEDA APPLIED SCIENCES CORPORATION            Topic: N/A

    A Vacuum Arc Ion Source for Heavy Ion Fusion Applications DOE Grant No. DE-FG03-98ER86071 Amount: $100,000 Small Business Alameda Applied Sciences Corp. 2235 Polvorosa Avenue Suite 230 San Leandro, CA 94577-2249 Dr. Niansheng Qi, Principal Investigator Dr. Mahadevan Krishnan, Business Official (510) 483-4156 Research Institution Lawrence Berkeley National Laboratory Sponsored Projects Offic ...

    STTR Phase I 1998 Department of Energy
  6. CLINICAL SCALE EXPANSION OF HUMAN DENDRITIC CELLS

    SBC: Aastrom Biosciences, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1998 Department of Health and Human Services
  7. MATERIALS AND PROCESSES FOR ASEROSPACE RTM

    SBC: Abaris            Topic: N/A

    THE U.S. AIR FORCE HAS AN INTEREST IN HIGH RATE, LOW COST, PRODUCTION PROCESSES FOR AIRCRAFT PARTS. ABARIS PROPOSES A COMBINED ANALYSIS AND TESTING PROJECT TO EXPLORE MODIFYING PRESENT RESIN TRANSFER MOLDING (RTM) TECHNIQUES TO EVALUATE THE FEASIBILITY OF THEIR USE IN THE PRODUCTION OF HIGH PERFORMANCE, AEROSPACE, COMPOSITE MATERIALS. EPOXY RESINS SHALL BE UTILIZED IN COMBINATION WITH GRAPHITE REI ...

    SBIR Phase I 1991 Department of DefenseAir Force
  8. DESIGN AND DEVELOPMENT OF ADHESIVELY BONDED JOINTS

    SBC: Abaris            Topic: N/A

    THE U.S. ARMY HAS A NEED FOR A LIGHTWEIGHT, STRONG, MOBILE BRIDGE. ONE PROBLEM THAT LIMITS THE PERFORMANCE IS THE DESIGN OF ADHESIVE JOINTS. THIS PROJECT IS TO DEVELOP SEVERAL OPTIMUM JOINT DESIGNS SO THAT THE LOADS ON JOINTS OF EITHER TUBULAR AND FLAT COMPONENTS ARE IN SHEAR, AND THE STRESS CONCENTRATIONS ARE REDUCED. THE PROPOSED PROGRAM IS TO USE THE RESEARCH WE HAVE ACCOMPLISHED IN EXPERT SYST ...

    SBIR Phase I 1991 Department of DefenseArmy
  9. ASSESSMENT OF FIBER REINFORCED PLASTICS FOR COMBATANT SUBMARINE STRUCTURES

    SBC: Abaris            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseNavy
  10. Workflow Management and Prioritization for Allocator and Assessor Processing

    SBC: DEUMBRA, INC.            Topic: N/A

    The current problem of handling thousands of workflows and hundreds of tasks associated with these workflows within the current ALP architecture is enormous. In this effort we propose efficient and scalable data structure and algorithms that can order the workflows and associated tasks to be processed by the Assessor. In addition, we provide the capability to correlate workflows with actual logi ...

    SBIR Phase I 1998 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government