You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Secure Agent-Based Collaboration Environment

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: 39c

    72526S03-I Collaboration on experimental nuclear physics projects is international and requires hundreds of participants. Due to the sheer size and complexity of the experiments, a great deal of the experimental planning, equipment design, preparation, and assembly must be carried out prior to the experimental runs. A low cost method for secure remote communications is needed to allow the colla ...

    SBIR Phase I 2003 Department of Energy
  2. Fiber Optic Dissolved Oxygen Sensing System for Remote Monitoring

    SBC: Airak, Inc.            Topic: N/A

    50397-98-I Fiber Optic Dissolved Oxygen Sensing System for Remote Monitoring--Airak Engineering, Rte 3, Box 533, 415 Chesnut Avenue, New Castle, VA 24127-9519; (540) 864-7821 Mr. Paul Grems Duncan, Principal Investigator Mr. Paul Grems Duncan, Business Official DOE Grant No. DE-FG02-98ER82521 Amount: $75,000 One of the largest problems facing field biologists and aquaculturists is the inabilit ...

    SBIR Phase I 1998 Department of Energy
  3. Low-Cost, Modular, Highly Reliable Inverter

    SBC: Airak, Inc.            Topic: N/A

    72743S03-I Today¿s current inverter technologies for electric and hybrid-electric vehicle systems do not lend themselves well to modularity. The inverter designs tend to be application-specific, which translates into larger inverter sizes and/or increased development cost. Also, the accompanying low volume production of such specialized inverters increases parts cost significantly. This proje ...

    SBIR Phase I 2003 Department of Energy
  4. STTR Phase I: Integrated Magneto-Optic Current Sensor for Power Electronics Modules

    SBC: Airak, Inc.            Topic: N/A

    This Small Business Technology Transfer (STTR) Phase I project proposes to develop magneto-optical current and temperature sensors capable of direct integration into power electronic modules, with the design goal of improving reliability and survivability of the power conversion and control circuitry. Existing power electronics designs generally use one of three components to sense current in pow ...

    STTR Phase I 2003 National Science Foundation
  5. SBIR Phase I: Aerosolized Biological Agents Detection

    SBC: Allomics, Inc.            Topic: N/A

    This Small Business Innovation Research (SBIR) Phase I project will develop a fast, reliable and sensitive technology that can identify the nature and the content of the particles in aerosol samples, and provide an early warning of the presence of bio-warfare agents. Current biological agent detection systems rely on point detectors that cannot sample actual aerosol condition in real-time. Additio ...

    SBIR Phase I 2003 National Science Foundation
  6. Highly Efficient and Reliable AC-DC Power Converters for Next-Generation Linear Colliders

    SBC: American Research Corporation of Virginia            Topic: N/A

    50931-98-I Highly Efficient and Reliable AC-DC Power Converters for Next-Generation Linear Colliders--American Research Corporation of Virginia, 1509 Fourth Street, P.O. Box 3406, Radford, VA 24141-4617; (540) 731-0655 Dr. Russell J. Churchill, Principal Investigator Dr. Russell J. Churchill, Business Official DOE Grant No. DE-FG02-98ER82527 Amount: $75,000 Future research in High Energy Physi ...

    SBIR Phase I 1998 Department of Energy
  7. Quantum Tunneling Biosensor Identifies Endocrine Disrupters

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    STTR Phase I 1998 National Science Foundation
  8. An Extremely High Power, Field-Coupled, Low-Loss RF Transmission Line for SRF Cavities

    SBC: Avar Inc.            Topic: N/A

    73155S03-I Superconducting particle accelerators require high power radio frequency (RF) couplers that have high capital and operational costs. The operational costs include power dissipation at cryogenic temperatures and operational down time. New coupler designs are needed to reduce these costs for particle accelerators that will require even higher RF power than now available. This project ...

    SBIR Phase I 2003 Department of Energy
  9. A New SRF Cavity Processing Technique for the Elimination of Field Emission and Surface Preparation in Fully Assembled Cavities

    SBC: Avar Inc.            Topic: N/A

    73156S03- I Superconducting Radio Frequency (SRF) cavities are a critical device for present and future particle accelerators in military, research, and industrial applications. The performance of these cavities is limited by field emission, which is controlled by cavity processing techniques. However, currently available processing techniques provide less-than-satisfactory cavity performance, ...

    SBIR Phase I 2003 Department of Energy
  10. SBIR Phase I: Multi Photon Detection (MPD) Enhanced Food Quality Diagnostics

    SBC: BIOTRACES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1998 National Science Foundation
US Flag An Official Website of the United States Government