You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Milestone Mall

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: N/A

    There are major changes in today's business methods. Expensive and time consuming travel for gathering project personnel together will be replaced, in part, by network-centric technology. Management directives of large corporations are increasinglystipulating the use of a collaborative workspace environment for their organizations that are non-collocated. In the defense sector, time-to-market of ...

    SBIR Phase I 2003 Department of DefenseAir Force
  2. Eigen-Similarity Integral (ESI)- A New Concept for Invariant Image Similarity Detection

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: N/A

    Most of today's precision guided weapons use Global Positioning System (GPS) signals to gain improved accuracy. But, as Operation Iraqi Freedom recently showed, foreign militaries have equipment to locally jam GPS signals. Another effective method ofautonomous navigation is necessary to ensure mission success. Similar to rudimentary terrain recognition used in early cruise missiles, the matching o ...

    STTR Phase I 2003 Department of DefenseAir Force
  3. Next-Generation, Unifying Agent Architecture

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: N/A

    Agents, Agent Architectures and Agent-based applications have become a phenomena in recent years with seemingly everyone jumping on the bandwagon. However, as with any truly revolutionary breakthrough technology, Agents have lacked standards and rulingbodies to govern the direction of the bandwagon in its infancy. While inside this wagon train apparent chaos ruled, but with that chaos came many ...

    SBIR Phase I 2003 Department of DefenseDefense Advanced Research Projects Agency
  4. Workflow Management and Prioritization for Allocator and Assessor Processing

    SBC: DEUMBRA, INC.            Topic: N/A

    The current problem of handling thousands of workflows and hundreds of tasks associated with these workflows within the current ALP architecture is enormous. In this effort we propose efficient and scalable data structure and algorithms that can order the workflows and associated tasks to be processed by the Assessor. In addition, we provide the capability to correlate workflows with actual logi ...

    SBIR Phase I 1998 Department of DefenseDefense Advanced Research Projects Agency
  5. Dynamic Data Mining for Information Exploitation

    SBC: DEUMBRA, INC.            Topic: N/A

    Sucessful completion of Phase I efforts shall provide the Air Force with an intelligent dynamic data mining architecture and demonstration prototype. We shall develop the concept of a profile that shall be used as a basis for identification and linking of relationships based on a rough sketch or profile of the situation. The use of profiles shall be used in enhancing existing case-based and asso ...

    SBIR Phase I 1998 Department of DefenseAir Force
  6. WEIGHT, COMPACT SOLAR WATER DISTILLATION PURIFICATION DEVICE

    SBC: Abel Company            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseDefense Advanced Research Projects Agency
  7. ABDUCTIVE NETWORKS FOR COMPLEX AERONAUTICAL SYSTEMS DEVELOPMENT

    SBC: ABTECH CORPORATION            Topic: N/A

    INNOVATIVE ARTIFICIAL INTELLIGENCE TECHNIQUES HAVE THE POTENTIAL TO SOLVE MANY COMPLEX AIR FORCE PROBLEMS. ADVANCES IN COMPUTING SPEED AND EXISTING SOFTWARE TECHNOLOGY ALONE ARE UNLIKELY TO RESULT IN REAL-TIME AERONAUTICAL SYSTEMS CAPABLE OF MEETING THE COMPLEX REQUIREMENTS OF THE AIR FORCE MISSION. RATHER, AN ALTERNATIVE METHODOLOGY SUCH AS ABDUCTIVE TECHNOLOGY, A NEW TECHNOLOGY PRESENTED IN THIS ...

    SBIR Phase I 1990 Department of DefenseAir Force
  8. ABDUCTIVE NETWORKS FOR SPACE SURVEILLANCE AND CLASSIFICATION

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseAir Force
  9. Innovative Information System Technologies

    SBC: ADEPTECH SYSTEMS, INC.            Topic: N/A

    Publish-subscribe-query systems have been evolving from costly, monolithic, proprietary applications into a client-server model based on web services. More recently, distributed peer-to-peer systems based on undifferentiated end-user systems have beenexplored. All of these approaches tend to suffer from inherent architectural scalability limits.Based on its experience in building business-to-bus ...

    SBIR Phase I 2003 Department of DefenseAir Force
  10. Intelligent Tutor Development for Information Operations

    SBC: Adroit Systems, Inc.            Topic: N/A

    Adroit Systems Inc. (ASI), in association with Klein Associates Inc., proposes to develop an Intelligent Computer Aided Instruction (ICAI) training system for information operations personnel to maximize mission effectiveness and achieve Information Superiority. Training objectives will focus on Crew Resource Management (CRM) principles. Those principles necessitate a comprehensive system tailor ...

    SBIR Phase I 1998 Department of DefenseAir Force
US Flag An Official Website of the United States Government