You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
SBIR Phase I: Development of a Deployable Instrument for Voltammetric Analysis of Key Redox Species
SBC: Analytical Instrument Systems Inc Topic: N/AN/A
SBIR Phase I 1998 National Science Foundation -
MICROWAVE AIDED LIPOSUCTION
SBC: AMT, INC. Topic: N/AN/A
SBIR Phase I 1998 Department of Health and Human Services -
AUTOMATED DEVICE MODEL EXTRACTION
SBC: ANSOFT CORP. Topic: N/AAccurate modeling of active RF devices is a critical component in circuit and system design. In the past the generated model's accuracy depended heavily on the expertise of the scientist who was performing the model extraction. This proposal develops algorithms and scripting planning for reducing this labor intensive device model extraction process to a PC based automated system. The user, thr ...
SBIR Phase I 1998 Department of DefenseAir Force -
SBIR Phase I: Virtual Prototyping of Assistive Devices
SBC: APPLIED RESOURCES CORPORATION Topic: N/AN/A
SBIR Phase I 1998 National Science Foundation -
Conducting Polymer Based Actively IR Modulating Electrochromics
SBC: Ashwin-Ushas Corporation Topic: N/AIn recent and ongoing work, this firm has developed, for a classified IR-counter-measures applications, large area, active electrochromic flat panel displays (FPDs), based on unique Conducting Polymer (CP) systems and a unique device design. These are very thin (less than 3 mm) and flexible, and exhibit high contrast in the mid/-far-IR (up to 93% Diffuse Reflectance range at 10 microns). Switchi ...
SBIR Phase I 1998 Department of DefenseAir Force -
ELECTROCHROMIC FAST DARKENING SUNWEAR FOR ARMD
SBC: Ashwin-Ushas Corporation Topic: N/AN/A
SBIR Phase I 1998 Department of Health and Human Services -
Transition to the Objective C4T Modeling and Simulation Enviroment
SBC: Atlantic Consulting Services, Inc. Topic: N/AModeling and simulation (M&S) is profoundly affecting the way the Army develops, acquires, tests, and fields new technologies for the future battlefield. While M&S has made a significant impact on Army digitization initiatives to date, fully realizing its benefits in the research, development, and acquisition (RDA); advanced concepts requirements (ACR); and training, exercises, and military operat ...
SBIR Phase I 1998 Department of DefenseArmy -
FAST PDB SEARCHES FOR BIOCHEMICALLY SIMILAR SURFACES
SBC: Bk Computer Corporation Topic: N/AN/A
SBIR Phase I 1998 Department of Health and Human Services -
SBIR Phase I: Automated Design-Rule Generator for Optimal Electronic Chip Manufacture
SBC: Cambridge Hydrodyn Inc Topic: N/AN/A
SBIR Phase I 1998 National Science Foundation -
SBIR Phase I: Theory and Simulation of Dense Phase Granular Materials
SBC: Cambridge Hydrodyn Inc Topic: N/AN/A
SBIR Phase I 1998 National Science Foundation