You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A Portable Electronic Composite Track Loading Fixture
SBC: ADVANCED TECHNOLOGIES GROUP, INC. Topic: N/AN/A
SBIR Phase I 1998 Department of Transportation -
Interactive Instructional CD System
SBC: A.J. Boggs and Company Topic: N/AN/A
SBIR Phase I 1998 Department of Transportation -
N/A
SBC: CMS Engineering Systems, Inc. Topic: N/AN/A
SBIR Phase I 1998 Department of Transportation -
Innovative Multi-Celluar Pultruded Composite Guardrail
SBC: Creative Pultrusions, Inc Topic: N/AN/A
SBIR Phase I 1998 Department of Transportation -
Development of a Lightweigt Portable Track Loading Fixture
SBC: EBERT COMPOSITES CORPORATION Topic: N/AN/A
SBIR Phase I 1998 Department of Transportation -
N/A
SBC: LUNA INNOVATIONS INCORPORATED Topic: N/AN/A
SBIR Phase I 1998 Department of Transportation -
Geographic Information System-Based Computer Assisted Interviewing Software
SBC: GeoSystems Global Corp. Topic: N/AN/A
SBIR Phase I 1998 Department of Transportation -
Development of Destination, Mode, and Routing Choice Modes for Freight
SBC: Jack Faucett Associates, Inc Topic: N/AN/A
SBIR Phase I 1998 Department of Transportation -
Low-Cost Safety Interlock for Frontal Air Bags
SBC: Jaycor, Inc. Topic: N/AN/A
SBIR Phase I 1998 Department of Transportation -
Development of Intensity Controls for Fiber Optic Approach Light Systems
SBC: Lighting Innovations, LLC Topic: N/AN/A
SBIR Phase I 1998 Department of Transportation