You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Validation Device for Cold Expanded Holes
SBC: RESODYN CORPORATION Topic: AF141207ABSTRACT: Resodyn Corporation proposes to develop a portable, cost effective, near-surface residual stress measuring tools based on electromagnetic principles. Resodyn Corporation has patented technology developed for validating cold expanded button head rivet holes.The first application in Phase I is to apply this technology to countersunk cold expanded rivet holes in 7075 aluminum. In Phase I ...
SBIR Phase I 2015 Department of DefenseAir Force -
Next Generation Boat Hull Impact and Abrasion Proofing
SBC: RESODYN CORPORATION Topic: N131022Resodyn Corporation proposes to develop a single tough thermoplastic polymer coating material and system solution for aluminum and composite boat hulls. The coating functions as an adhesive for attaching doubler plates. It encapsulates and prevents water from corroding metal substrates plus it is hydrophobic and can include corrosion inhibitors and colorant. Basic polymer components are tough ther ...
SBIR Phase II 2015 Department of DefenseNavy -
Multi-channel tunable ultra-stable source for all-fiber space-based atomic interactions
SBC: ADVR, INC. Topic: AF151080ABSTRACT:The development of compact, reliable inertial navigation systems is essential for applications where GPS-based systems are ineffective or unavailable. This Phase I SBIR will establish the feasibility of developing an ultra-stable, compact, robust, integrated laser source suitable for atom-based precision navigation and timing (PNT) systems. AdvRs design is enabled by capitalizing on well- ...
SBIR Phase I 2015 Department of DefenseAir Force -
Optical Waveguide Cross-Correlator for Attosecond Timing Synchronization
SBC: ADVR, INC. Topic: 32cThis Phase II STTR will develop a precision balanced optical cross-correlator using engineered nonlinearoptical waveguides. The proposed device will be important for future advances at large scale accelerator facilities by providing a means to achieve long-term sub-femtosecond timing and synchronization of all of a facilitys optical and RF sub-systems over fiber optic links. Statement of how this ...
STTR Phase II 2015 Department of Energy -
A compact, high-performance imaging spectroradiometer
SBC: RESONON, INC. Topic: 20aStatement of the Problem: Large-area, high-resolution hyperspectral imaging is needed to accurately understand the carbon-cycle between the atmosphere and terrestrial systems. To do this cost-effectively, small UAVs will be needed, for which there are currently no hyperspectral imagers that meet both the performance requirement of DOE and the size/weight requirements for deployment on small UAVs. ...
SBIR Phase I 2015 Department of Energy -
Lidar-based high resolution 3D imager and remote gas sensor: a new paradigm for terrestrial environmental monitoring
SBC: Bridger Photonics, Inc. Topic: 18eImproved measurement technologies are needed to better understand the carbon cycle and its roll in climate change. For instance, the arctic and sub-arctic tundra represents an enormous and complex source and sink of greenhouse gases. Rising global temperatures could significantly alter the balance of this critical carbon cycle component. Yet improved scientific instruments are needed to more full ...
SBIR Phase II 2015 Department of Energy -
Visual Tire Pressure Indication
SBC: RightPSI, Inc. Topic: AF151169ABSTRACT: RightPSI, Inc. AF-151-169 Proposal # 2084 Volume One: Technical Abstract RightPSI has 8 years of experience in visual tire pressure indication. Research and engineering development has resulted in the Fill Through Tire Pressure Indicator (FTTPI), an effective, patented product for civilian vehicles. Popular Mechanics magazine recognized the product design with an Editors Choice Award in ...
SBIR Phase I 2015 Department of DefenseAir Force -
SBIR Phase II: New Fluorescent Biosensors for Drug Discovery in Living Cells
SBC: MONTANA MOLECULAR LLC Topic: BCThe broader impact/commercial potential of this Small Business Innovation Research (SBIR) Phase II project is that it will generate new live cell assays for the discovery of new drugs. Roughly half of the drugs sold today target G protein coupled receptors (GPCRs) in the body, so finding better drugs that target these receptors, with fewer side effects, is an important societal goal. Many of the G ...
SBIR Phase II 2015 National Science Foundation -
Direct Conversion of Organic Municipal Solid Waste to Lipids using an Extremophilic Fungus
SBC: SUSTAINABLE BIOPRODUCTS LLC Topic: 13NCERC2The United States produces significant quantities of waste materials that are discarded. These wastes include organic components of municipal solid waste (MSW), biosolids from wastewater treatment plants and agricultural wastes. The release of these materials and their byproducts into the environment can have serious consequences, such as pollution of ground and surface water resources and spread ...
SBIR Phase II 2015 Environmental Protection Agency -
Digital Acquisition and Wavelength Control of Seed Laser for Space-Based LIDAR Applications
SBC: ADVR, INC. Topic: S101This SBIR Phase II proposes the development and delivery of a compact, space qualifiable, diode-based seed laser system that utilizes a digital controller to allow autonomous acquisition of lock to the required wavelength in remote environments for multi-wavelength flight and space-based lidar applications. Successful development of this technology, due to its compact, efficient, and reliable des ...
SBIR Phase II 2015 National Aeronautics and Space Administration