List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for the given year is not complete until April of the following year. Annual Reports data is a snapshot of agency reported information for that year and hence might look different from the live data in the Awards Information charts.

  1. RESETTABLE-PRESSURE HYDROCEPHALIC SHUNT W/REMOTE READOUT

    SBC: Frontier Technology Inc.            Topic: n/a

    THE ULTIMATE OBJECTIVE OF THIS EFFORT IS TO DEVELOP A HYDROCEPHALIC SHUNT THAT INCORPORATES A RESETTABLE-PRESSURE VALVE MECHANISM AND AN INTRACRANIAL PRESSURE (ICP) SENSOR WITH REMOTE READ-OUT DISPLAY. THE PURPOSE FOR THIS DEVICE IS TO PROVIDE NEUROSURGEONS WITH A SHUNT THAT CAN BE ADJUSTED AT ANY TIME SO AS TO IMPROVE DEGREE OF CONTROL OVERTHE ICP, AND THEREBY IMPROVE THE QUALITY OF HEALTH CARE. ...

    SBIR Phase I 1991 Department of Health and Human Services
  2. COMPLEMENTARY OPERATIONS CONCEPTS AND REQUIREMENTS FOR THE NEXT MULTI-ROLE FIGHTER

    SBC: Frontier Technology Inc.            Topic: n/a

    BY ABOUT 2003, DELIVERIES OF A NEW MULTI-ROLE FIGHTER TO REPLACE THE F-16 WILL BE NEEDED. IT WILL REQUIRE MUCH SUPERIOR COMBAT CAPABILITIES AND SURVIVABILITY TO THE F-16, BUT MUST COST NO MORE. ONE APPROACH TO IMPROVE COST EFFECTIVENESS IS THROUGH "COMPLEMENTARY" OPERATIONS BETWEEN THE MULTI-ROLE AIRCRAFT AND SPECIALIZED AIRCRAFT, WHICH MAY BE ENABLED BY NEW "INTERMITTING" DATA LINK TECHNOLOGIES. ...

    SBIR Phase II 1991 Air ForceDepartment of Defense
  3. COMMAND CONTROL AND COMMUNICATIONS SYSTEMS/SUBSYSTEM-INNOVATIVE C3 CONCEPTS FOR SRT ATTACK

    SBC: Frontier Technology Inc.            Topic: n/a

    THE ULTIMATE OBJECTIVE OF THIS RESEARCH ACTIVITY IS TO DEVELOP A C3 MASTER PLAN TO SUPPORT THE SRT ATTACK MISSION. THIS PLAN WILL BE DEVELOPED IN THE CONTEXT OF A MID/FAR TERM SRT ATTACK ARCHITECTURE CURRENTLY BEING DEVELOPED BY FRONTIER FOR THE AERONAUTICAL SYSTEMS DIVISION/DEPUTY FOR DEVELOPMENT PLANNING (ASD/XR). THIS ON-GOING ACTIVITY WILL EXPAND AND EVOLVE THE CURRENT/NEAR SAC PLANS INTO AN I ...

    SBIR Phase II 1991 Air ForceDepartment of Defense
  4. TOWED DECOY COUNTER-COUNTERMEASURES

    SBC: Frontier Technology Inc.            Topic: n/a

    THE PROPOSED PHASE I RESEARCH PROGRAM WILL DEFINE AND EVALUATE TECHIQUES AND TACTICS INTENDED TO COUNTER THE TOWED DECOY ELECTRONIC COUNT-MEASURE (ECM) THREAT TO AIRBONRE RADARS, IN THE STUDY CANDIDATETECHNIQUES WILL BE EVALUATED AS TO THEIR PERFORMANCE CAPABILITIES AND THEIR FEASIBILITY. PERFORMACNE WILL BE MEASURED IN TERMS OF THE RADAR'S ABILITY TO DISCRIMINATE BETWEEN DECOYS AND TRUE TARGETS. ...

    SBIR Phase I 1991 Air ForceDepartment of Defense
  5. INTEGRATING A COST ARCHITECTURE METHODOLOGY WITHIN A DYNAMIC WORK STATION ENVIRONMENT

    SBC: Frontier Technology Inc.            Topic: n/a

    N/A

    SBIR Phase I 1991 Air ForceDepartment of Defense

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government