You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Low Cost, Lightweight, High Performance Transparent Armor

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    For military aircraft and land vehicles, there is a need for lightweight transparent armor that will provide a high level of ballistic protection at moderate cost. Hardfaced armor provides protection against (pointed) projectiles at very low arealdensities relative to other armor configurations. The current transparent hardface materials are either unaffordably expensive (sapphire, ALON), or low ...

    SBIR Phase II 2001 Department of DefenseSpecial Operations Command
  2. Composite Pilothouse for the Mark V Special Operations Craft

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    MK V SOC service failures have occurred where the windshield and entire pilothouse assembly have collapsed on wave impact. Such failures have even occurred at moderate speeds in fairly benign seas. The modular pilothouse can also suffer from structuraldegradation due to the disassembly operations required for C-5 transport.A composite pilothouse, with fully integrated windshields panels and modula ...

    SBIR Phase I 2001 Department of DefenseSpecial Operations Command
  3. Clandestine Marker System

    SBC: Idolon Technologies            Topic: N/A

    The requirement for an inexpensive portable tagging system arises from the need totag and track U.S. military assets. The object of the Phase 1 is to determine thefeasibility of a clandestine barcode-like device, which has low energy/power requirements.This device will have a simple user interface and rugged construction. It is afurther objective to demonstrate the feasibiilty of a

    SBIR Phase I 2001 Department of DefenseSpecial Operations Command
  4. Innovative Automated Morse Code System

    SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION            Topic: N/A

    In the Phase I of the proposed effort, IEM will produce an innovative automatic CW Morse Code system which will operate on a HF radio. The proposed system will be low power, small, light weight and useable by typical personnel. IEM will perform anexhaustive search for all components to look for suitable COTS solutions. Innovative approaches, designs, and solutions will then be combined with COTS s ...

    SBIR Phase I 2001 Department of DefenseSpecial Operations Command
  5. Body Worn Antenna Vest

    SBC: Megawave Corporation            Topic: N/A

    This proposal describes the development of a conformal body worn antenna subsystem to be integrated into a tactical vest that is capable of operating in both an omnidirectional threat detection mode and a direction finding mode. In Phase I, theperformance goals for the antenna subsystem will be established, and antenna configurations capable of meeting these objectives will be defined and anal ...

    SBIR Phase I 2001 Department of DefenseSpecial Operations Command
  6. SEAL Tactical Simulator

    SBC: REALITY BY DESIGN, INC.            Topic: N/A

    Reality by Design, an Advanced Interactive Systems company, proposes to fuse two compelling technologies to create a training simulator that is capable of recreating these emerging threats with stunning realism. This SEAL Tactical Simulator will progressfrom a collection of suitable scenarios to development of tactical responses to determining the relative merits of each option. This new trainin ...

    SBIR Phase I 2001 Department of DefenseSpecial Operations Command
  7. Composite, Stuff-Proof Windshield and Lightweight Pilothouse Assembly

    SBC: Tri-Cycle Product Design, Inc.            Topic: N/A

    The offerer proposes to design a fully responsive, Stuff-Proof Pilothouse Modification (SPPM), to the MK V Special Operations Craft. Utilizing a proven design methodology, advanced materials, and innovative engineering, a retro-fit to the existing deckstructure will be defined. A

    SBIR Phase I 2001 Department of DefenseSpecial Operations Command
  8. Renewable Electric Energy Source for Special Operations Force (SOF) Maritime Combatant Craft

    SBC: AERODYNE RESEARCH INC            Topic: SOCOM05001

    An electric power source is needed that is two-man portable or lighter, operates on logistics fuels (JP-8, diesel), is quiet, and has a low thermal signature. We propose the MICE (Miniature Internal Combustion Engine) generator that is currently being developed by Aerodyne Research to deliver 500 W electrical power using logistics fuels. The design for this MICE generator will weigh less than 16 ...

    SBIR Phase I 2005 Department of DefenseSpecial Operations Command
  9. Fuel Cell Quiet Auxiliary Power Unit for Special Ops

    SBC: PROTONEX TECHNOLOGY CORP.            Topic: SOCOM05001

    Protonex will develop a quiet, durable, high-energy source which is able to power auxiliary electrical equipment for SOCOM operations. It must be able to withstand a harsh operational environment and be lightweight, compact and man portable. Protonex proposes to develop a quiet Auxiliary Power Unit (APU) that will meet all the energy, power and other requirements for this application. This syst ...

    SBIR Phase I 2005 Department of DefenseSpecial Operations Command
  10. Unmanned Autonomous Vehicle Intelligence, Surveillance, and Reconnaissance (ISR) Payload Interface Master Module, PIMM

    SBC: GECO, INC.            Topic: SOCOM05005

    The GECO Payload Interface Master Module Phase I development approach capitalizes on both our telecom and defense electronic design experiences to provide SOCOM with an optimal PIMM design. GECO's research trade studies will allow us to deliver the best performance that commercial technologies can support and our design engineering experience will insure the optimal solution is fielded in a packa ...

    SBIR Phase I 2005 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government