You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. N.

    SBC: N A T Development Inc            Topic: N/A

    N.A.T. DEVELOPMENT HAS DEVELOPED A THREE PART APPROACH TO ACHIEVE EMP SHIELDING IN NEW AND USED EQUIPMENT THAT PROVIDES SUPERIOR ECONOMICS, AS WELL AS IMPROVED PHYSICAL PROPERTIES. THE GOALS AND OBJECTIVES OF THE PROJECT FOLLOW. 1) OPTIMIZATION OF THE RHEOLOGICAL/APPLICATION PROPERTIES OF 'STATE OF THE SCIENCE' CONDUCTIVE COATINGS. THESE SYSTEMS COMBINE THE EMP CONDUCTIVE EFFICIENCIES OF SILVER AN ...

    SBIR Phase I 1986 Department of DefenseDefense Threat Reduction Agency
  2. HIGH ENERGY/POWER DENSITY RAPID DISCHARGE BATTERIES- NEW APPROACH

    SBC: CASTLE TECHNOLOGY CORP.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseMissile Defense Agency
  3. SYSTEMS

    SBC: PHYSICAL SCIENCES INC.            Topic: N/A

    WE PROPOSE TO DEVELOP A TECHNIQUE FOR RAPID TEMPORAL AND SPATIAL IMAGING OF HIGH POWER LASER BEAMS. THIS METHOD IS WINDOWLESS AND MAY BE EMPLOYED WHERE LASER INTENSITIES EXCEED THE DAMAGE THRESHOLDS FOR CONVENTIONAL CALORIMETRIC METHODS. THE DIAGNOSTIC UTILIZES THE TECHNIQUE OF OPTICAL-INFRARED DOUBLE RESONANCE TO OBSERVE BEAM INTENSITIES. IN THIS TECHNIQUE, THE OUTPUT OF A MWIR CHEMICAL LASER (DF ...

    SBIR Phase I 1986 Department of DefenseDefense Threat Reduction Agency
  4. AN OPTIMUM RADIO COMMUNICATION SYSTEM FOR ROBOTIC VEHICLES- STUDY PROGRAM

    SBC: Comdel Inc.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseArmy
  5. WHILE THE THEORETICAL BOUNDS ON THE ENERGY STORED BY AND THE POWER OUTPUT OF ELECTROCHEMICAL POWER SOURCES ARE WELL DEFINED BY THERMODYNAMIC AND PHYSICAL CONSIDERATIONS, THE DEGREE TO WHICH ONE CAN APPROACH THE THEORETICAL BOUNDS IS DETERMINED BY

    SBC: Cape Cod Research            Topic: N/A

    WHILE THE THEORETICAL BOUNDS ON THE ENERGY STORED BY AND THE POWER OUTPUT OF ELECTROCHEMICAL POWER SOURCES ARE WELL DEFINED BY THERMODYNAMIC AND PHYSICAL CONSIDERATIONS, THE DEGREE TO WHICH ONE CAN APPROACH THE THEORETICAL BOUNDS IS DETERMINED BY CONTRAINTS IMPOSED BY THE DESIGN OF THE ELECTRODES AND PACKAGING MATERIALS. THIS RESEARCH DEALS WITH AN INNOVATIVE CONCEPT FOR MATERIALS AND PACKAGE DESI ...

    SBIR Phase I 1986 Department of DefenseDefense Advanced Research Projects Agency
  6. THERE IS A REQUIREMENT FOR AN IMPROVED RADOME MATERIAL, WITH A FINER GRAIN STRUCTURE, GREATER STRENGTH AT ELEVATED TEMPERATURES AND GREATER EROSION RESISTANCE (PARTICULARLY TO RAIN) THAN PRESENT MATERIALS.

    SBC: Merix Corp            Topic: N/A

    THERE IS A REQUIREMENT FOR AN IMPROVED RADOME MATERIAL, WITH A FINER GRAIN STRUCTURE, GREATER STRENGTH AT ELEVATED TEMPERATURES AND GREATER EROSION RESISTANCE (PARTICULARLY TO RAIN) THAN PRESENT MATERIALS. THIS NEW MATERIAL MUST BE CAPABLE OF BEING FABRICATED INTO INTRICATE SHAPES WITH ACCURATE DIMENSIONS BY COLD FORMING AND ATMOSPHERIC SINTERING; AND ITS CHANGE IN DIELECTRIC CONSTANT MUST BE LESS ...

    SBIR Phase I 1986 Department of DefenseNavy
  7. GENERATING SYSTEMS

    SBC: Merix Corp            Topic: N/A

    MEMBRANE BASED INERT GAS GENERATING SYSTEMS FOR INERTING OF FUEL TANK ULLAGE SPACE TO CARRY A LOWER AIRCRAFT PENALTY THAN SYSTEMS BASED ON MOLECULAR SIEVES AND SYSTEMS BASED ON STORAGE OF CRYOGENIC NITROGEN. WITH CURRENT TECHNOLOGY, APPROXIMATELY 30 LBS OF MEMBRANE MATERIAL ARE NECESSARY PER LB/MIN OF INERT GAS REQUIRED. MERIX PROPOSES A NEW APPROACH FOR PRODUCING A COMPOSITE AIR SEPARATION MEMBRA ...

    SBIR Phase I 1986 Department of DefenseAir Force
  8. NEUTRAL PARTICLE BEAM LOCATION, AIMING CALIBRATION AND TARGET HIT IDENTIFICATION

    SBC: Spire Corporation            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseMissile Defense Agency
  9. PRECISE MISSILE BODY LOCATION USING VACUUM CORE EMISSION

    SBC: SPECTRAL SCIENCES, INC            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseMissile Defense Agency
  10. NO ABSTRACT AT THIS

    SBC: Spire Corporation            Topic: N/A

    NO ABSTRACT AT THIS TIME

    SBIR Phase I 1986 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government