You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Novel Distributed Processing Environments
SBC: SHARPE ENGINEERING, INC. Topic: OSD09SP7DoD data processing requirements are dramatically evolving. Dataset size and variety are rapidly increasing, as are the speed at which the data is generated and the need for faster response times. However, the problem is more than simply having to deal with data size or speed of arrival. Rapidly evolving problem spaces and requirements mean that the processing and analysis solutions also must be ...
SBIR Phase I 2009 Department of DefenseNavy -
A fast response, open flow, integrating nephelometer for fine scale measurements of aerosol and cloud particles
SBC: Droplet Measurement Technologies, LLC Topic: N08190The Controlled Towed Vehicle (CTV) has the capability to provide low level, 10 m, detailed information on ocean-atmosphere interactions for several hour periods of time with the tow aircraft maintaining a comfortable and safe flight altitude of 1000-2000 ft. Previous work has detailed turbulence, water vapor and carbon dioxide fluxes from the CTV. In this proposal the capabilities of the CTV will ...
SBIR Phase II 2009 Department of DefenseNavy -
Comprehensive data-reduction and analysis package for cloud and precipitation particle imager data.
SBC: STRATTON PARK ENGINEERING CO., INC. Topic: N08192In Phase I SPEC completed fabrication of a novel new instrument, the 3V-CPI, which makes high-speed size-distribution measurements and records high-resolution digital images of cloud particles. Also in Phase I SPEC continued to develop and improve software modules used to analyze 3V-CPI data. In Phase II SPEC anticipates working closely with the National Center for Atmospheric Research (NCAR) Rese ...
SBIR Phase II 2009 Department of DefenseNavy -
Low cost, lightweight, low power Precise Positioning System (PPS) GPS Solution for Software Defined Radios
SBC: THE NAVSYS CORPORATION Topic: N07198Under this proposed effort, NAVSYS will leverage our expertise with developing ultra-low power GPS solutions to develop a software GPS receiver solution that can be embedded into military software defined radios (SDR) for handheld, unattended sensors and weapon applications. The objective of this effort is to develop a lightweight GPS application “GPS-Lite” which is capable of performing PPS G ...
SBIR Phase II 2009 Department of DefenseNavy -
Optimal Seafloor Mapping Technologies
SBC: The Survice Engineering Company LLC Topic: N091088This proposal addresses the challenge of improving the capability of littoral battlespace sensing, specifically the automation and optimization of bathymetric-hydrographic mapping capabilities of unmanned undersea vehicle (UUV) platforms when operating in the littoral. Current UUV capabilities are challenged by limitations of fielded sensors and the integration/processing of those sensor outputs, ...
SBIR Phase I 2009 Department of DefenseNavy -
Broadband, lightweight, low profile passive phased array
SBC: FIRST RF CORPORATION Topic: N092102The FIRST RF design combines cutting-edge technology in broadband phased array elements and high impedance metamaterials to produce a lightweight, low profile antenna array covering UHF through C-band frequencies. The array architecture minimizes the variation in gain and beamwidth over a nearly 20:1 bandwidth using a straightforward aperture architecture that avoids complex frequency-dependent ex ...
SBIR Phase I 2009 Department of DefenseNavy -
A Novel Approach to Impregnating Structural Resin into Carbon Nanotube (CNT) Assemblies to Yield Ultrahigh-Loaded Polymer Nanocomposites
SBC: COMPOSITE TECHNOLOGY DEVELOPMENT, INC. Topic: N08T017The primary objective of this program is the further development of ultrahigh-loaded carbon nanotube (CNT) polymer composites as next-generation structural materials. In Phase II, Composite Technology Development, Inc. (CTD) and The University of Texas at Dallas (UTD) propose significant advancements in material and process development, testing and characterization, and manufacturing toward a spec ...
STTR Phase II 2009 Department of DefenseNavy -
Compact High-Frequency Antennas-CPP
SBC: Pharad, LLC Topic: N06T032This CPP effort will augment the development, testing and evaluation of our compact HF antenna technology in order to accelerate the fielding of its capabilities to Naval warriors. In this CPP, we will carry out risk reduction activities aimed at improving our capability to deliver this technology to the DoD. The CPP is focused on ensuring the HF antenna compliance with military environmental perf ...
STTR Phase II 2009 Department of DefenseNavy -
Reconfigurable Satellite Planning Tool
SBC: DESIGN NET ENGINEERING LLC Topic: N091089It takes up to 10 years to design, build and launch a satellite system. The satellite system reflects the 10-year-old (or more) outdated, inflexible technology and mission needs that may no longer be applicable to the tactics and geography of today’s evolving conflicts. These new conflicts create the need for mission changes that cannot be accommodated by current systems. Recent advances in tech ...
SBIR Phase I 2009 Department of DefenseNavy -
Universal Signal Matching for RF Threat Classification
SBC: NUMERICA CORPORATION Topic: N092113The U.S. Navy uses digital wideband electronic warfare (EW) receivers for RF threat warning and cueing of countermeasures to protect Navy aircraft. The receivers accomplish these functions by processing RF waveforms from enemy radars, extracting pulse parameters, and conducting emitter identification. The receiver''s ability to accurately identify the emitter type (necessary for warning and counte ...
SBIR Phase I 2009 Department of DefenseNavy