You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ADAPTIVE ARRAY TECHNOLOGY FOR TRANSPORTABLE LONG WAVELENGTH GROUND-BASED BISTATIC RADAR SYSTEMS

    SBC: Adaptive Sensors Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  2. DIAGNOSIS OF NATURAL AND INDUCED DISEASES OF MILITARY IMPORTANCE

    SBC: Adeza Biomedical Corpon            Topic: N/A

    WE PROPOSE TO DEVELOP A SIMPLE, PORTABLE, ONE-STEP ASSAY FOR THE DETECTION OF MYCOPLASMA PNEUMONIAE AND INFLUENZA A WHICH CAN BE PERFORMED INDEPENDENT OF A SOPHISTICATED LABORATORY BY UNTRAINED OR SEMI-SKILLED PERSONNEL. THIS SIMPLE, ONE-STEP METHOD IS CALLED AN OPTICAL BIOASSAY (OBA) AND UTILIZES AN INEXPENSIVE LASER AND PHOTODETECTOR TO DETECT AN ANTIGEN-ANTIBODY BINDING EVENT. ANTIBODY IS COVAL ...

    SBIR Phase II 1991 Department of DefenseArmy
  3. DISTRIBUTED PROCESSING FOR BALLISTIC DEFENSE SYSTEMS

    SBC: Advanced Decision Systems            Topic: N/A

    THE OBJECTIVE OF THIS STUDY IS THE DEVELOPMENT OF TOOLS AND TECHNIQUES DESIGNED TO AID IN THE ABILILTY TO DEVELOP DISTRIBUTED COMPUTING SYSTEMS FOR REAL-TIME ENVIRONMENT. THE INITIAL INVESTIGATION WILL FOCUS ON THE DEVELOPMENT AND AND EVALUATION OF INTERCEPTOR MANAGEMENT ALGORITHMS USING ARTIFICIAL INTELLIGENCE PLANNING TECHNIQUES. THE WORK TO BE PERFORMED DURING PHASE I WILL INCLUDE DEVELOPING AN ...

    SBIR Phase II 1986 Department of DefenseArmy
  4. OPERATIONS MONITORING ASSISTANT

    SBC: Advanced Decision Systems            Topic: N/A

    THIS PROPOSAL CONCERNS THE BASIC RESEARCH AND DEVELOPMENT REQUIRED TO DEFINE AN OPERATIONS MONITORING ASSISTANT (OMA) WHICH IS INTENDED AS A TOOL FOR ASSESSING THE IMPACT OF CURRENT EVENTS ON A CORPS, OR DIVISION LEVEL OPERATIONS PLAN. THE SYSTEM IS PRINCIPALLY CONCERNED WITH FULFILLING AN INDICATIONS AND WARNING FUNCTION, THAT IS, WITH PREDICTING THE CONSEQUENCES OF IMPORTANT BATTLEFIELD EVENTS I ...

    SBIR Phase II 1986 Department of DefenseArmy
  5. SPATIAL DATA STRUCTURES FOR ROBOTIC VEHICLE ROUTE PLANNING

    SBC: Advanced Decision Systems            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseArmy
  6. THRUST AUGEMENTATION SYSTEM FOR LOW COST EXPENDABLE TURBOJET ENGINE

    SBC: Advanced Engineering            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  7. FREQUENCY TRANSLATOR GPS SIGNAL RECEIVER

    SBC: 3s Navigation (dba For            Topic: N/A

    THE USE OF TRANSLATED OR TRANSDIGITIZED GLOBAL POSITIONING SYSTEM (GPS) SIGNALS IS A PROMISING METHOD FOR DETERMINING THE PRECISE FLIGHT PATH OF AN ARTILLERY SPOTTER ROUND. THE PRIMARY ELEMENTS OF THE GPS ARTILLERY SPOTTER ROUND SYSTEM ARE A GPS TRANSLATOR OR TRANSDIGITIZER IN THE PROJECTILE FUSE AND A TRANSLATED/TRANSDIGITIZED GPS RECEIVER LOCATED AT THE FIRING PLATFORM. THIS SYSTEM WILL PROVIDE ...

    SBIR Phase I 1991 Department of DefenseArmy
  8. A Performance and Thermal Simulation Code for Hybrid Electric Vehicle Design

    SBC: Advanced Projects Research, Incorporated            Topic: N/A

    The complex HEV power systems necessitates flexible and dynamic simulation software providing tools for evaluating, characterizing and optimizing these systems. Existing software have neglected to characterize significant component data such as heat loads, cabin cooling requirements, battery thermal management, and heat rejection. Vehicle performance (accounting for environmental conditions and s ...

    SBIR Phase I 1998 Department of DefenseArmy
  9. Numerically Efficient Rotorcraft Trim and Transient Response

    SBC: ADVANCED ROTORCRAFT TECHNOLOGY, INC.            Topic: N/A

    We propose to develo a numerically efficient rotorcraft trim and transient response algorithm. The algorithm is intended for application in a periodic dynamic system with a large number of degrees of freedom as is commonly the case in current comprehensive rotorcraft analysis codes (such as 2GCHAS). The innovation of this proposal can be summarized as follows: 1) Utilizing Model Order Reduction ...

    SBIR Phase II 1998 Department of DefenseArmy
  10. A REAL-TIME BLADE ELEMENT ROTORCRAFT SIMULATION DEVELOPMENT

    SBC: ADVANCED ROTORCRAFT TECHNOLOGY, INC.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseArmy
US Flag An Official Website of the United States Government