You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Advanced Automated Inventory Technology Utilizing SOUND

    SBC: THE TONE KNOWS INC            Topic: DLA232005

    The TONE Knows Inc. ("TONE") will develop next-generation warehouse inventory management, verification, location, and reconciliation utilizing our patented "audio QR Code" technology. This technology allows for the continuous monitoring, tracking, and accounting for every single item stored in a DLA DC, external storage areas, in-theater Distribution Centers, or forward storage facilities, util ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  2. Redwood Materials- Optimizing Lithium-Ion (Li-Ion) Battery Recovery Technology to Reclaim Cobalt and Nickel from Industrial and Defense Waste Streams

    SBC: Redwood Materials            Topic: DLA221002

    To meet critical and growing defense and industry needs for energy storage over the coming decades and reduce risk of foreign reliance will require establishment and rapid growth of a competitive domestic supply chain for lithium-ion batteries. This supply chain and its participants, such as DLA customers, will require sustained access to battery materials, including metals such as nickel and coba ...

    SBIR Phase I 2022 Department of DefenseDefense Logistics Agency
  3. Low-Cost Tooling as Enabling Technology for Drastic Cost Reductions of DLA Parts

    SBC: NEVADA COMPOSITES INC            Topic: DLA10001

    The ultimate objective of the work outlined in this proposal is to develop, demonstrate and commercialize a new technology for accurate, rapid, low-cost tooling for discreet parts manufacturing of high-performance composite components. This tooling results from a new tool-production process and is suitable for prototyping, repair,

    SBIR Phase I 2011 Department of DefenseDefense Logistics Agency
  4. Advanced Technologies for Discrete-Parts Manufacturing

    SBC: MANUFACTURING LABORATORIES, INC.            Topic: DLA08001

    Significant advances have been made in machining technology, most notably machining centers capable of spindle speeds and feedrates that are an order of magnitude higher than conventional. However, the use of this new technology requires much more technical expertise, and experience and intuition are no longer sufficient. Specifically, machine tool productivity can be greatly enhanced if informati ...

    SBIR Phase I 2009 Department of DefenseDefense Logistics Agency
  5. Advanced Battery Manufacturing Technologies

    SBC: K2 ENERGY SOLUTIONS, INC.            Topic: DLA142001

    K2 Energy Solutions, a manufacturer of lithium ion batteries headquartered in Henderson, NV, will develop a cell manufacturing process that eliminates the use of VOCs. The elimination of VOCs will result in substantial reductions in cell raw materials costs as well as substantial reductions in facility construction and operational costs.

    SBIR Phase I 2014 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government