You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ROTARY WING HOVER PERFORMANCE PREDICTION

    SBC: CONTINUUM DYNAMICS INC            Topic: N/A

    N/A

    SBIR Phase I 1983 National Aeronautics and Space Administration
  2. THE OBJECTIVE OF THIS PROJECT IS TO INVESTIGATE SEVERAL TECHNOLOGIES WHICH, WHEN TAKEN TOGETHER IN A COMPLETE SYSTEM, PROVIDE THE CAPABILITY TO OBTAIN FLIGHT TEST DATA ON VERY LOW REYNOLDS NUMBER AIRFOILS AT ALTITUDES BETWEEN 11 AND 30 KM FOR COMPARISON

    SBC: Partnerships Limited, Inc.            Topic: N/A

    THE OBJECTIVE OF THIS PROJECT IS TO INVESTIGATE SEVERAL TECHNOLOGIES WHICH, WHEN TAKEN TOGETHER IN A COMPLETE SYSTEM, PROVIDE THE CAPABILITY TO OBTAIN FLIGHT TEST DATA ON VERY LOW REYNOLDS NUMBER AIRFOILS AT ALTITUDES BETWEEN 11 AND 30 KM FOR COMPARISON WITH WIND TUNNEL AND ANALYTICAL INVESTIGATIONS. THE APPROACH IS TO DEVELOP AN AUTONOMOUS FLIGHT TEST VEHICLE HAVING A WING SPAN OF 5.9 METERS. SMA ...

    SBIR Phase I 1983 National Aeronautics and Space Administration
  3. HIGH SPEED HELICAL GEAR POWER TRANSMISSION

    SBC: Transmission Technology Co Inc            Topic: N/A

    N/A

    SBIR Phase I 1983 National Aeronautics and Space Administration
  4. THE PRIMARY PURPOSE OF THIS PROJECT IS TO REDUCE THE REQUIREMENTS FOR INITIAL ALIGNMENT ACCURACY WHEN BRINGING A PAIR OF CONNECTORS TOGETHER PRIOR TO MATING THEM.

    SBC: Arbus, Inc.            Topic: N/A

    THE PRIMARY PURPOSE OF THIS PROJECT IS TO REDUCE THE REQUIREMENTS FOR INITIAL ALIGNMENT ACCURACY WHEN BRINGING A PAIR OF CONNECTORS TOGETHER PRIOR TO MATING THEM. THIS WILL BE ACCOMPLISHED BY INVESTIGATING THE USE OF A TAPERED OR CONICAL DESIGN TO INCLUDE A PRELIMINARY LATCHING FEATURE TO CAPTURE AND TO CAUSE ALIGNMENT OF A PAIR OF COMPLEMENTARY CONNECTORS. THE INVESTIGATION WILL TAKE INTO CONSIDE ...

    SBIR Phase I 1984 National Aeronautics and Space Administration
  5. ROTARY WING HOVER PERFORMANCE PREDICTION

    SBC: CONTINUUM DYNAMICS INC            Topic: N/A

    THE ACCURATE PREDICTION OF THE PERFORMANCE OF A HELICOPTER ROTOR IN HOVER IS CRITICAL TO THE SUCCESS OF THE DESIGN. A NOVEL APPROACH TO THE SOLUTION OF THE HELICOPTER FREE WAKE HOVER PROBLEM IS ADDRESSED BY FINDING THE SELF-PRESERVING WAKE SHAPE WHICH IS STEADY IN BLADE-FIXED COORDINATES. THE SOLUTION CAN BE USED TO PREDICT THE AVERAGE PERFORMANCE OF ROTOR IN HOVER. THE SOLUTION OBTAINED BY AN INF ...

    SBIR Phase II 1984 National Aeronautics and Space Administration
  6. CURED

    SBC: Dr. Murray S. Cohen & Assoc.            Topic: N/A

    A NEWLY DEVELOPED POLYMER SYSTEM IS DESCRIBED THAT HAS THE UNIQUE PROPERTY OF EXPANDING WHEN CONVERTED FROM THE LIQUID (UNCURED) TO THE SOLID (CURED) STATE. COATINGS ON STEEL MADE FROM THIS CLASS OF MATERIALS SHOULD BE DESIRABLE BECAUSE THE POLYMER TO METAL BOND IS INTIMATE AND WOULD RESIST ATTACK BY SALT SPRAY AND OTHER CORROSIVE AGENTS. DESCRIBED IS A PROGRAM TO FORMULATE COATINGS, APPLY THEM TO ...

    SBIR Phase I 1984 National Aeronautics and Space Administration
  7. TRANSMITTER

    SBC: General Optronics Corp            Topic: N/A

    THE PRIMARY OBJECTIVE OF THIS PROGRAM IS TO DEVELOP A PHASE-LOCKED LASER DIODE ARRAY THAT CAN DELIVER OUTPUT POWER GREATER THAN 200 MW. THE DIODE SHOULD HAVE LONG LIFE AND BE CAPABLE OF MODULATED BANDWIDTHS GREATER THAN 500 MHZ. THE OUTPUT BEAM SHOULD BE ABLE TO BE COLLIMATED TO WITHIN ONE MILLIRADIAN SO THAT IT IS SUITABLE FOR LONG DISTANCE SPACE COMMUNICATION. THE PHASE I EFFORT INVESTIGATES TWO ...

    SBIR Phase I 1984 National Aeronautics and Space Administration
  8. ENCAPSULATION

    SBC: Gumbs Associates, Inc.            Topic: N/A

    A SERIES OF ELASTOMERIC SILICONES AND SILICONE-IMIDES WILL BE SYNTHESIZED AND SCREENED FOR APPLICATION AS SOLAR CELL ENCAPSULANTS IN PHOTOVOLTAIC ARRAYS TO BE DEPLOYED IN SPACE. KEY PHYSICAL PROPERTIES SUCH AS THE TENSILE MODULUS, OPTICAL ABSORBANCE OVER 300 NM-1100 NM, LONG-TERM STABILITY IN VACUUM UV, REFRACTIVE INDEX, AND THERMAL PROPERTIES AS WELL AS CHARGING AND FLAMMABLITY CHARACTERISTICS WI ...

    SBIR Phase I 1984 National Aeronautics and Space Administration
  9. HIGH SPEED HELICAL GEAR POWER TRANSMISSION

    SBC: Transmission Technology Co Inc            Topic: N/A

    AIRCRAFT GAS TURBINE ENGINES OPERATE AT SPEEDS RANGING FROM 10,000 TO 30,000 RPM. TO HARNESS THIS POWER AND TO OPERATE AT DESIRED OUTPUT SPEEDS, THE INDUSTRY RELIES ON THE USE OF HIGH SPEED TRANSMISSION SYSTEMS. AS POWERS AND SPEEDS OF THEENGINES ARE INCREASING, THE GEAR INDUSTRY HAS RESPONDED TO TO THESES NEW REQUIREMENTS WITH HIGHER QUALITY HARDWEAR, CLEANER STEELS, AND IMPROVED MANUFACTURING TE ...

    SBIR Phase II 1984 National Aeronautics and Space Administration
  10. SUPERSONIC COMBUSTION ENHANCEMENT BY A NONEQUILIBRIUM PLASMA JET

    SBC: Aerochem Research            Topic: N/A

    IT IS PROPOSED TO DETERMINE THE FEASIBILITY OF USING A NONEQUILIBRIUM PLASMA JET, DEVELOPED AT AEROCHEM OVER THE PAST QUARTER CENTURY, AS A MEANS OF ENHANCING IGNITION AND FLAME STABILIZATION IN AIR-BREATHING ENGINES AND IN SUPERSONIC COMBUSTION. SPECIFICALLY, WE WILL DETERMINE; IF IGNITION OF LEAN OR LOW PRESSURE MIXTURES CAN BE MADE MORE RELIABLE; IF FLAME HOLDING LIMITS CAN BE BROADENED, E.G., ...

    SBIR Phase I 1987 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government