You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  2. DEVELOPMENT OF VISUAL INSTRUCTION MATERIALS FOR MATH AND SCIENCE CURRICULUM USING THE TOPOLOGICAL PANORAMA CAMERA

    SBC: Janet Gelphman Photography            Topic: N/A

    LEARNING ABILITIES IN MATHEMATICS AND THE SCIENCES ARE NOT MAXIMIZED BECAUSE OF THE LACK OF VISUAL INSTRUCTIONAL MATERIALS. THE IMPROVEMENT OF THESE SKILLS IS IMPORTANT BECAUSE BETTER SCIENCE AND MATH ABILITIES ARE NEEDED IN THE UNITED STATES IN ORDER TO KEEP UP WITH OTHER INDUSTRIALIZED NATIONS. OUR PROPOSED SOLUTION IS TO USE A NEW TECHNOLOGY, THE TOPOLOGICAL PANORAMA CAMERA, TO CREATE COST-EFFE ...

    SBIR Phase I 1987 Department of Education
  3. A NOVEL SPRING-CLUTCH STABILIZER TO AID WHEELCHAIR USERS IN TRAVERSING ENVIRONMENTAL BARRIERS

    SBC: Triangle Research and Development Corporation            Topic: N/A

    A PHASE I PROGRAM IS PROPOSED TO DEVELOP A FRONT CASTER STABILIZING DEVICE THAT, WHEN INSTALLED ONTO A COMMON WHEELCHAIR TO VEER DOWNHILL WHEN TRAVERSING A SLOPE WAS IDENTIFIED IN A NATIONAL REPORT ON TECHNOLOGY FOR THE HANDICAPPED AS A SIGNIFICANT PROBLEM FOR WHEELCHAIR MOBILITY. COMBATING THIS TENDENCY CAN EXHAUST INDIVIDUALS PROPELLING A WHEELCHAIR ACROSS A SLOPE AS SLIGHT AS TWO DEGREES REQUIR ...

    SBIR Phase I 1990 Department of Education
  4. IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    MOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  5. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government