You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
EMBEDDED PAVEMENT STRESS SENSORS CONTAINING PIEZOELECTRIC COMPOSITES
SBC: Fiber Materials, Inc. Topic: N/AFIBER MATERIALS, INC. (FMI) PROPOSES SENSORS WHICH CAN BE EMBEDDED IN PAVEMENT TO MEASURE STRESS AND STRAIN FROM TRUCKS PASSING OVER AT SPEEDS UP TO 60 MPH. THESE SIMPLE, DURABLE SENSORS WILL BE MADE FROM PIEZOELECTRIC COMPOSITES WHICH ACT AS PASSIVE SENSORS AND DEVELOP A CHARGE PROPORTIONAL TO THE APPLIED PRESSURE. THE CHARGE IS CONVERTED TO A VOLTAGE WHICH IS RECORDED ON NEARBY EQUIPMENT. THE PH ...
SBIR Phase II 1995 Department of Transportation -
LOW COST SMART MAGNETOMETER FOR TRAIN DETECTION/MONITORING
SBC: KVH INDUSTRIES, INC. Topic: N/APRESENT TRAIN DETECTION SCHEMES RELY LARGELY ON A LOW RESISTANCE THROUGH THE TRAIN'S WHEELS TO PERTURBATE A STABLE ELECTRICAL CIRCUIT. WHILE ELEGANT IN PRINCIPLE, THE DESIGN IS PLAGUED BY OXIDE FILMS AND MATERIAL BUILDUP ON THE RAIL, SNEAK PATHS THROUGH THE BALLAST AND OTHER UNCONTROLLABLE VARIABLES. KVH INDUSTRIES PROPOSES TO DESIGN AND DELIVER A "SMART MAGNETOMETER"-BASED SENSOR PACKAGE WHICH WI ...
SBIR Phase II 1995 Department of Transportation -
Seamless Flexible Fuel Tanks- 65% TOC Reduction
SBC: Response Technologies, LLC Topic: DLA152001The DoD uses flexible fuel bladders in multiple air, ground, and sea vehicles because they: 1) easily fit into almost any space, 2) are corrosion resistant, and can often be self-sealing and explosion resistant, 3) allow for customized placement of fittings and connection points, and 4) these flexible tanks can collapse as they empty, thereby reducing the need for venting and minimizing sloshing a ...
SBIR Phase II 2016 Department of DefenseDefense Logistics Agency -
URBAN TRANSIT COST RECOVERY FEASIBILITY STUDY
SBC: Williams-kuebelbeck & Assc Inc Topic: N/AURBAN TRANSIT IMPROVEMENTS ENHANCE THE VALUE OF THE PROPERTY THEY SERVE. TRADITIONAL URBAN TRANSIT FINANCING TECHNIQUES NEGLECT THIS POTENTIAL SOURCE OF REVENUE. BENEFIT ASSESSMENT DISTRICTS AND IMPACT MITIGATION FEES, BASED ON CONCEPTS ORIGINALLY DEVISED FOR MINOR IMPROVEMENTS (EG. SIDEWALKS), HAVE BEEN APPLIED EXPERIMENTALLY TO URBAN TRANSIT, BUT DO NOT GENERATE THE MAJOR FUNDING URBAN TRANSIT R ...
SBIR Phase I 1987 Department of Transportation