You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Portland Cement Concrete Pavement Recycling

    SBC: Road Processing Resources Inc.            Topic: N/A

    RPR's Phase I contract proved the feasibility of concrete recycling based o a shock-producing hammer/anvil concept for fracturing and sizing aggregate and separating reinforcing steel into marketable scrap. The Phase II project will develop a portable self-propelled prototype to remove and process a 12 foot wide roadway at a rate of about a mile a day. This is called "Fast Track" highway removal ...

    SBIR Phase II 2004 Department of Transportation
  2. Advanced Truck for High Speed Freight Operations

    SBC: Sharma & Associates, Inc.            Topic: N/A

    During Phase I of the project, Sharma & Associates, Inc. developed a concept for a high speed freight truck intended for 70-ton, regular freight and bi-modal operation at speeds up to 150 mph. The truck uses a rigid frame and an independent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Ve ...

    SBIR Phase II 2004 Department of Transportation
  3. Software Package for Material Model Evaluation

    SBC: APTEK, Inc.            Topic: N/A

    This Phase I and II SBIR will develop a user-friendly, run-time efficient software package dedicated to fitting and evaluating material models used in finite element codes like LS-DYNA. The software package will consist of a pre-processor, a core driver, and a post-processor. The pre-processor will allow the user to specify the material model, model parameters, and desired load history. The dri ...

    SBIR Phase II 2004 Department of Transportation
  4. Synoptic Approach to Harmonize Discrete Data Streams in Application Development

    SBC: IT WORKS! INC.            Topic: 180NH1

    Research conducted in Phase I identified a range of data sources providing vehicle related information to consumers shopping around or interested in knowing more about vehicles. Majority of the commercial data sources focused on vehicle features, new/used/CPO pricing, and vehicles listings. Such data sources lacked safety as their central focus, which is a concern for U.S. Department of Transporta ...

    SBIR Phase II 2019 Department of Transportation
US Flag An Official Website of the United States Government