You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Advanced Instrumentation for Non-Nulling Stack Velocity Testing
SBC: AIRFLOW SCIENCES CORP Topic: NoneIndustrial facilities, manufacturing plants, and electric power plants that burn fossil fuels exhaust the combustion products to atmosphere through their smokestacks. Stack pollutant emissions are quantified using manual testing methods developed in the 1960s, which are prone to error if non-axial flow exists in a stack.Recently, NIST has been working on an improved technique of performing 3D flow ...
SBIR Phase I 2019 Department of CommerceNational Institute of Standards and Technology -
A universal wafer-level capping process for MEMS and microdevices
SBC: EPACK, INC. Topic: ICThis Small Business Innovation Research (SBIR) Phase I project provides a universal capping technology for microelectromechanical systems (MEMS) and other microdevices. The technology will allow for thousands of moving MEMS devices to get protected from the environment in an inert gas or vacuum. The cap wafer technology itself has already been developed-the focus of this project is to develop a wi ...
SBIR Phase I 2010 National Science Foundation -
AUTOMATED SCREENING SYSTEM USING CELLULAR ELECTRODES
SBC: Process Biotechnology, Inc. Topic: N/AN/A
SBIR Phase I 1987 National Science Foundation -
Decision Support Tools for Sustainable Manufacturing
SBC: BIMCON Inc. Topic: N/AThe objective of this proposal is to establish the feasibility of developing an integrated decision support tool that transforms the current time-consuming and reactive (post-design) sustainability assessment into a real-time, proactive approach available in the early phases of product design. This tool, called Sustainability Integrated into Early Design (SIED), will define and capture lifecycle-w ...
SBIR Phase I 2010 Department of CommerceNational Institute of Standards and Technology -
Development of a low cost thermal storage system using a novel Phase Change Material for use with solar thermal and waste heat recovery systems
SBC: Fulcrum Composites Inc Topic: BCThis Small Business Innovation Research Project will develop a thermal storage system combined with solar thermal heating and waste heat recovery allowing energy to be accumulated throughout the year to be used when needed in winter. The use of a new phase change material as the energy storage device, combined with the use of winter and summer heat generation will make feasible the storage of suf ...
SBIR Phase I 2010 National Science Foundation -
Development of a Neutron-based Nondestructive Test Method for Concrete Petrography and Chemical Analysis
SBC: TOURNEY CONSULTING GROUP, LLC Topic: NoneTo evaluate the technical feasibility of prompt gamma neutron activation (PGAA) as an alternative to a set of standard destructive tests of concrete petrography including aggregate type, water/cement ratio, aggregate/binder ratio, density, chloride content and chloride bulk diffusion constant; and to determine the specifications for the design of a dedicated commercial laboratory-based PGAA facili ...
SBIR Phase I 2019 Department of CommerceNational Institute of Standards and Technology -
Dual Plane 3D Compton Scattering Imager with Pixelated CZT Detectors for 1-10MeV Gamma Ray
SBC: H3D INC Topic: NonePhase I has proven that the current setup achieves better than 8mm spatial resolution for 2.2MeV prompt gammas. However, 1mm spatial resolution presents a significant challenge for the current setup due in part to limited timing resolution and count rate. A new analog ASIC will be developed to replace the current analog ASIC that will have better timing resolution and deliver higher count rates. I ...
SBIR Phase II 2019 Department of CommerceNational Institute of Standards and Technology -
Efficient plasma synthesis of high-quality graphene
SBC: APS LLC Topic: NMThis Small Business Technology Transfer (STTR) Phase I project aims to develop a highly-efficient and cost-effective plasma-based method for graphene mass production. The approach is to utilize unique properties of magnetically controlled arc discharge to couple the plasma production of carbon species and the synthesis of graphene. The broader/commercial impact of this project will be the potenti ...
STTR Phase I 2010 National Science Foundation -
Efficient plasma synthesis of high-quality graphene
SBC: Invalid Data Topic: MMThis Small Business Technology Transfer (STTR) Phase I project aims to develop a highly-efficient and cost-effective plasma-based method for graphene mass production. The approach is to utilize unique properties of magnetically controlled arc discharge to couple the plasma production of carbon species and the synthesis of graphene._x000D_ _x000D_ The broader/commercial impact of this project will ...
SBIR Phase I 2010 National Science Foundation -
FLAW DETECTION, SIZING AND LOCATION BY DIFFERENTIAL GAMMA SCATTERING SPECTRUM TECHNIQUE
SBC: Florida Nuclear Associates Inc Topic: N/ATHE PROGRAM PROPOSED HEREIN INVOLVES ANALYTICAL AND EXPERIMENTAL RESEARCH TO CAREFULLY EVALUATE AND FURTHER DEVELOP THE DIFFERENTIAL GAMMA SCATTERING TECHNIQUE FOR ACCURATE NON-INVASIVE DETERMINATION OF VOIDS, CRACKS, FLAWS IN MATERIALS AND THE DEFECTS SIZING AND LOCATION CAPABILITIES OF THIS METHOD. THIS NEW DEVICE, WHICH WE HAVE TERMED "DIFFERENTIAL GAMMA SCATTERING SPECTRUM PROBE (DGSSP)," IS B ...
SBIR Phase II 1987 National Science Foundation