You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. LOW COST HRPT DIRECT READOUT STATION

    SBC: International Systems & Soft-            Topic: N/A

    THIS ABSTRACT COVERS THE PROPOSED DESIGN OF A LOW COST HRPT DIRECT READOUT STATION FOR A COST OF LESS THAN $100K DOLL ARS. THIS CONCEPT UTILIZES STATE-OF-THE-ART TECHNOLOGY PROVEN SUCCESSFUL IN COMMERCIAL APPLICATIONS. THE SUCCESSFULDEVELOPMENT OF THE LOW-COST HRPT STATION WILL OPEN A COMMERCIAL AND GOVERNMENT MARKET THAT HAS A NEED FOR CURRENT WEATHER INFORMATION. THESE POTENTIAL USERS HAVE DELAY ...

    SBIR Phase II 1987 Department of Commerce
  2. Optimized CO2 Gas Sensor for Autonomous Measurement of Ocean Carbon

    SBC: DIOXIDE MATERIALS, INC.            Topic: 822R

    The objective of the proposed work is to create low cost, low power sensors for autonomous measurement of ocean carbon. In our Phase I effort, we showed that Dioxide Materials’ miniature CO2 sensors have the speed and sensitivity to meet NOAA’s requirements for sensing ocean carbon. The objective of the proposed work is to further develop the sensors so that they can be used directly in NOAA ...

    SBIR Phase II 2015 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Dual Plane 3D Compton Scattering Imager with Pixelated CZT Detectors for 1-10MeV Gamma Ray

    SBC: H3D INC            Topic: None

    Phase I has proven that the current setup achieves better than 8mm spatial resolution for 2.2MeV prompt gammas. However, 1mm spatial resolution presents a significant challenge for the current setup due in part to limited timing resolution and count rate. A new analog ASIC will be developed to replace the current analog ASIC that will have better timing resolution and deliver higher count rates. I ...

    SBIR Phase II 2019 Department of CommerceNational Institute of Standards and Technology
US Flag An Official Website of the United States Government