You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
SCILNTILLATION FIBER DETECTOR FOR IN-VIVO ENDOSCOPIC INTER- NAL DOSIMETRY
SBC: Center For Planning & Research Topic: N/AAN ALPHA/BETA RADIATION DETECTOR SUITABLE FOR USE IN THE INSTRUMENT CHANNEL OF A FIBEROPTIC ENDOSCOPE WILL BE WILL BE DEVELOPED TO PROVIDE IN-VIVO IN-SITU BIOASSAY MEASUREMENTS LEADING TO COMPUTER-ASSISTED ESTIMATES OF IN- TERNAL DOSE AND DISTRIBUTION IN THE RESPIRATORY AND GASTRO- INTESTINAL TRACTS. DURING PHASE I OF THE PROGRAM, ALPHA AND BETA PARTICLE SENSITIVE SCINTILLATING PLASTIC FIBERS WILL ...
SBIR Phase I 1987 Nuclear Regulatory Commission -
FACILITATE DEVELOPMENT AND EVALUATION OF FAULT TREES
SBC: Expert-ease Systems Topic: N/AWORKSTATION AND EXPERT SYSTEM TECHNOLOGIES HAVE A POTENTIAL OF SUBSTANTIALLY FACILITATING THE DEVELOPMENT AND EVALUATIONOF FAULT TREES. INTRODUCING A WORKSTATION PHILOSOPHY WITH AN INTERACTIVE SET OF INTEGRATED SOFTWARE TOOLS ON A LOCAL COMPUTER WILL PROMOTE IMPROVED CONTINUITY IN THE THOUGHT PROCESS DURING A FAULT TREE DEVELOPMENT. THE EXPERT SYSTEM TECHNOLOGY WILL SIMPLIFY THE WAY FAULT TREES AR ...
SBIR Phase I 1985 Nuclear Regulatory Commission -
AUTOMATIC CREATION AND RENODALIZATION OF TRAC-BWR INPUT DECKS
SBC: Expert-ease Systems Topic: N/ATHE OBJECTIVE OF THE PROPOSED RESEARCH IS TO BUILD A USER-FRIENDLY, PERSONAL COMPUTER BASED WORKSTATION FOR PERFORMING TRAC-BWR ANALYSIS. THE SOFTWARE WILL ALLOW A USER TO READ-IN DATA FROM EXISTING TRAC-BWR INPUT DECKS (ASCII), DRAW NODALIZATION DIAGRAM, MODIFY INPUT, AUTOMATICALLY RENODALIZE THE VESSEL, CHAN AND PIPE COMPONENTS, GENERATE INPUT DECK, SUBMIT JOB, BRING BACK PLOTDATA, DISPLAY RESUL ...
SBIR Phase I 1987 Nuclear Regulatory Commission -
"SEVERE ACCIDENT PHENOMENA: NATURAL CIRCULATION IN REACTOR COOLANT SYSTEM"
SBC: Fluid Physics Ind. Topic: N/AA RESEARCH PROGRAM IS PROPOSED FOR THE DEVELOPMENT OF A VALIDATED METHODOLOGY FOR PREDICTING THE EX-VESSEL BUOYANCY-DRIVEN FLOWS IN THE HOT LEG AND STEAM GENERATOR OF A WESTINGHOUSE PLANT, AND IN THE CANDY CANE HOT LEG OF A B&W PLANT. THE PROPOSED PHASE I WORK PLAN CONSISTS OF (A) REVIEWING AVAILABLE WESTINGHOUSE EXPERIMENTAL DATA AND SIMULATING THE EXPERIMENTAL CONFIGURATION, (B) VALIDATING THE M ...
SBIR Phase I 1987 Nuclear Regulatory Commission -
"EXTENDING A HCLPF-BASED SEISMIC MARGIN REVIEW TO ANALYZE PLANT DAMAGE STATES AND THE ROLE OF HUMAN FACTORS AND NON-SEISMIC FAILURES"
SBC: Future Resources Associate Inc Topic: N/ATECHNIQUES HAVE RECENTLY BEEN DEVELOPED TO ANALYZE THE 'SEISMIC MARGIN' OF A NUCLEAR POWER PLANT USING THE HCLPF CONCEPT (HIGH CONFIDENCE OF A LOW PROBABILITY OF FAILURE). STARTING WITH AN EARTHQUAKE LEVEL SHOSEN FOR MARGIN REVIEW, THE TECHNIQUE DETERMINES WHETHER THE PLANT CAN OR CANNOT 'WITHSTAND THE REVIEW-EARTHQUAKE WITHOUT CORE DAMAGE. HERE 'WITHSTAND' MEANS 'WITHSTAND WITH A HIGH CONFIDENCE ...
SBIR Phase II 1987 Nuclear Regulatory Commission -
PROBABILITY OF FLOODS WITH VERY LONG RETURN PERIODS
SBC: Linsley Kraeger Associates Ltd Topic: N/ATHIS PROPOSAL IS DIRECTED TO THE DEVELOPMENT OF A PROCEDURE FOR GENERATING LONG STREAMFLOW SEQUENCES. IT IS PROPOSED TO FIRST DEVELOP A LONG SEQUENCE OF HOURLY RAINFALL BY STOCHASTIC METHODS AND TO TRANSFORM THIS RAINFALL SEQUENCE INTO STREAMFLOW WITH A DETERMINISTIC HYDROLOGIC MODEL. PHASE I WILL FOCUS ON THE A STOCHASTIC RAINFALL MODEL CAPABLE OF DEVELOPING RAINFALL SEQUENCES AT MULTIPLE SITES. ...
SBIR Phase II 1985 Nuclear Regulatory Commission -
WITHIN A LABORATORY ENVIRONMENT, EMATS HAVE BEEN USED TO CHARACTERIZE DEFECTS IN BOTH FERRITIC AND AUSTENITIC WELDS.
SBC: Materials Engineering & Topic: N/AWITHIN A LABORATORY ENVIRONMENT, EMATS HAVE BEEN USED TO CHARACTERIZE DEFECTS IN BOTH FERRITIC AND AUSTENITIC WELDS . THE USE OF SHEAR-HORIZONTAL (SH) WAVES HAS PROVEN PART DEFECTS. FOR FRACTURE MECHANICS EVALUATION OF WELDED STRU STRUCTURES, IT IS PARTICULARLY IMPORTANT TO KNOW THE THROUGHEXTENT OF PLANAR DEFECTS. THIS PROPOSAL SEEKS SUPPORT FOR THE EVALUATION OF A NEW APPROACH TO WELD DEFECT CHA ...
SBIR Phase I 1985 Nuclear Regulatory Commission -
A REMOTE LASER INSPECTION SYSTEM FOR NUCLEAR REACTOR COMPONENTS
SBC: METROLASER, INCORPORATED Topic: N/ATHE DAMAGE FROM OPERATING STRESSES, AGING, AND ENVIRONMENT ACT TO MODIFY THE VIBRATIONAL MODAL PATTERNS OF NUCLEAR REACTOR COMPONENTS. WE PROPOSE TO EVALUATE THE FEASIBILITY OF APPLYING HOLOGRAPHIC TECHNIQUES FOR MONITORING AND QUANTIFYING THESE PATTERNS. THESE MEASUREMENTS COULD BE PERFORMED REMOTELY AND WITH MINIMUM DISRUPTION OF PLANT OPERATIONS. THE APPLICATION OF HOLOGRAPHY TO AUGMENT THE USE ...
SBIR Phase I 1991 Nuclear Regulatory Commission -
IN-REACTOR MEASUREMENTS INVOLVING ELECTROCHEMICAL POTENTIAL A NUMBER OF BOILING WATER REACTORS (BWRS) SUGGEST THAT THE WATER CHEMISTRY OF THE PRIMARY COOLANT OF EACH BWR MAY BE UNIQUE WITH RESPECT TO ITS ABILITY TO FACILITATE IGSCC AND/ OR MAY CHANGE
SBC: Michael Fox Topic: N/AIN-REACTOR MEASUREMENTS INVOLVING ELECTROCHEMICAL POTENTIAL A NUMBER OF BOILING WATER REACTORS (BWRS) SUGGEST THAT THE WATER CHEMISTRY OF THE PRIMARY COOLANT OF EACH BWR MAY BE UNIQUE WITH RESPECT TO ITS ABILITY TO FACILITATE IGSCC AND/ OR MAY CHANGE WITH REACTOR OPERATING TIME OR AGE. THE WORK PROPOSED IS TO GATHER, REVIEW, ORGANIZE, COMPILE, C COMPUTERIZE, AND ANALYZE IN-REACTOR DATA PERTAINING ...
SBIR Phase I 1985 Nuclear Regulatory Commission -
ANALYSIS AND TRAINING OF AN ARTIFICIAL NEURAL NETWORK NETWORK NUCLEAR POWER PLANTACCIDENT DIAGNOSTIC ADVISOR
SBC: Netrologic, Inc. Topic: N/ATHE OBJECTIVE OF THE PROPOSED RESEARCH IS TO DEVELOP AN ARTIFICIAL-INTELLIGENCE FAULT-DIAGNOSTIC SYSTEM THAT WILL CLASSIFY, IN REAL-TIME, NUCLEAR POWER PLANT TRANSIENTS AND PROVIDE ERROR BOUNDS ON ITS DIAGNOSES. THE GOAL IS TO DEVELOP AN ARTIFICIAL NEURAL NETWORK (ANN) PARADIGM THAT IS CAPABLE OF NOT ONLY PROVIDING A PROPER CLASSIFICATION BUT ALSO GIVING A FIGURE OF MERIT FOR ITS ANSWER. THE PROPO ...
SBIR Phase I 1991 Nuclear Regulatory Commission