You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Synoptic Approach to Harmonize Discrete Data Streams in Application Development

    SBC: IT WORKS! INC.            Topic: 180NH1

    Research conducted in Phase I identified a range of data sources providing vehicle related information to consumers shopping around or interested in knowing more about vehicles. Majority of the commercial data sources focused on vehicle features, new/used/CPO pricing, and vehicles listings. Such data sources lacked safety as their central focus, which is a concern for U.S. Department of Transporta ...

    SBIR Phase II 2019 Department of Transportation
  2. OF LONGITUDINAL STRESSES IN RAILS UNDER OPERATING CONDITIONS

    SBC: Eggers And Associates            Topic: N/A

    A NOVEL TECHNIQUE (PATENT IN APPLICATION) IS PROPOSED FOR THE NON-DESTRUCTIVE MEASUREMENT OF LONGITUDINAL STRESSES IN RAIL WHICH MAKE USE OF TWO PHENOMENA KNOWN AS (1) MAGNE TOSTRICTION AND (2) SKIN EFFECT. MAGNETOSTRICTION IS EXHIBITED BY FERROMAGNETIC MATERIALS SUCH AS RAIL STEELS AND GIVES RISE TO A CHANGE IN THE MAGNETIC PERMEABILITY WITH APPLIED STRESS. THE SKIN EFFECT DETERMINES THE DISTRIBU ...

    SBIR Phase I 1985 Department of Transportation
  3. WORKLOAD ASSESSMENT TECHNOLOGIES FOR THE OPTIMIZATION OF DATA LINK CONTROLLER

    SBC: NTI, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Transportation
  4. IMPROVEMENT OF AIR VOID ANALYSIS OF FRESH CONCRETE

    SBC: Technical Innovations            Topic: N/A

    WE WILL DETERMINE THE FEASIBILITY OF IMPROVED METHODS FOR DETERMING AIR CONTENT IN FRESH CONCRETE. WE EXPECT THAT A STUDY OF VOLUME CHANGE WITH VARYING PRESSURE AND VACUUM WILL LEAD TO A METHOD THAT WILL INDICATE BOTH AIR CONTENT AND VOID SIZE, AND YIELD AIR CONTENTS THAT T ARE UNAFFECTED BY THE NONTHEORETICAL COMPRESSIBILITY OF SMALL VOIDS. WE WILL DETERMINE THE FEACIBILITY OF SIMPLER METHODS OF ...

    SBIR Phase II 1987 Department of Transportation
  5. URBAN TRANSIT COST RECOVERY FEASIBILITY STUDY

    SBC: Williams-kuebelbeck & Assc Inc            Topic: N/A

    URBAN TRANSIT IMPROVEMENTS ENHANCE THE VALUE OF THE PROPERTY THEY SERVE. TRADITIONAL URBAN TRANSIT FINANCING TECHNIQUES NEGLECT THIS POTENTIAL SOURCE OF REVENUE. BENEFIT ASSESSMENT DISTRICTS AND IMPACT MITIGATION FEES, BASED ON CONCEPTS ORIGINALLY DEVISED FOR MINOR IMPROVEMENTS (EG. SIDEWALKS), HAVE BEEN APPLIED EXPERIMENTALLY TO URBAN TRANSIT, BUT DO NOT GENERATE THE MAJOR FUNDING URBAN TRANSIT R ...

    SBIR Phase I 1987 Department of Transportation
US Flag An Official Website of the United States Government