List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for the given year is not complete until April of the following year. Annual Reports data is a snapshot of agency reported information for that year and hence might look different from the live data in the Awards Information charts.

  1. NO MOVING PARTS RAIN GAUGE

    SBC: THE CORE GROUP, INC.            Topic: N/A

    THE U.S. WEATHER SERVICE PRESENTLY USES A "TIPPING BUCKET" RAIN GAUGE FOR MEASURING RAIN ACCUMULATION. THIS DEVICE IS SENSITIVE TO WIND AND MOTION (AS ON BUOYS), CANNOT MEASURE RAIN RATE, AND REQUIRES FREQUENT MAINTENANCE, BECAUSE OF MOVING PARTS. AN ALTERNATIVE DEVICE IS BEING PROPOSED, WHICH INCORPORATES A RIGID, RESONANT TUBE, CLOSED AT THE TOP BY AN ELECTRO-ACOUSTIC TRANSDUCER, AND AT THE BOTT ...

    SBIR Phase I 1994 Department of Commerce
  2. A Virtual Machining and Inspection System (VMIS)

    SBC: Icamp, Inc.            Topic: N/A

    The purpose of the VMIS is to allow manufacturers the luxury of testing and perfecting manufacturing plans long before a single machine tool is turned on and resources are committed. The VMIS will allow the user to select an available machine tool and an available inspection device, specify a proposed inspection plan and a dimensional analysis procedure, and then build and inspect hundreds (or ev ...

    SBIR Phase II 1996 Department of Commerce
  3. ROBUST DESIGN ENGINEERING WORKSTATION

    SBC: MANAGEMENT SCIENCES INC            Topic: N/A

    MSI PROPOSES TO INCORPORATE BACKGROUND SUBSTITUTION OF "FAULTY MODELS" IN CAD DESIGN SIMULATION OF ELECTRONIC CIRCUITS TO PERFORM A "DESIGN OF EXPRIMENTS" DETERMINATION OF SENSITIVITY TO PARAMETRIC VARIATION IN COMPONENTS. THE INFORMATION LEARNED WILL BE USED TO SELECT COMPONENTS THAT WILL HAVE A LONGER LIFE, AND GREATER DURABILITY. THIS FORM OF ANALYSIS COMBINED WITH WORST CASE SENSITIVITY ANALYS ...

    SBIR Phase I 1994 Department of Commerce
  4. An Expert System for Aquaculture Environment Control

    SBC: Ortech Engineering Inc.            Topic: N/A

    This Small Business Innovation Research Phase I project will explore the use of a fuzzy logic based expert system in a closed loop control system for nitrate removal (denitrification) from large aquaculture systems. Nitrate is naturally generated by the bio-mass in any aquatic system. Current techniques for the control of nitrate levels are almost exclusively based on water exchange. For large ...

    SBIR Phase II 1996 Department of Commerce
  5. A Diode Laser Multigas Analyzer for Advanced Detection of Fires

    SBC: Southwest Sciences, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Commerce
  6. DIODE LASER ABSOLUTE MOISTURE SENSOR

    SBC: Southwest Sciences, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Commerce
  7. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC.            Topic: N/A

    THE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  8. "Rolling Deflectometer"

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Transportation
  9. ON-BOARD BAR CODE DATA COLLECTION AND ANALYSIS SYSTEM

    SBC: B R Blackmarr & Assoc            Topic: N/A

    THE PROPOSED PROJECT WILL DETERMINE THE FEASIBILITY OF DEVELOPING A LOW-COST, INTEGRATED, BAR CODE TECHNOLOGY BASED INFORMATION SYSTEM WHICH CAN BE INSTALLED ON TRANSIT VEHICLES. THE PROJECT WILL RESULT IN A SURVEY BASED APPLICATION FEATURE REQUIREMENTS DEFINITION, A PHYSICALLY INTEGRATED HARDWARE AND OPERATING SYSTEM PLATFORM SPECIFICATION TO SUPPORT THE APPLICATIONS, A DETAILED APPLICATIONS SOFT ...

    SBIR Phase I 1994 Department of Transportation
  10. RESTRICTED VISIBILITY WARNING SYSTEM

    SBC: Ecotek International            Topic: N/A

    ECOTEK INTERNATIONAL PROPOSES AN ALL SOLID-STATE VISIBILITY MONITORING SYSETM THAT WILL BE USED TO MONITOR VISIBILITY CONDITIONS ALONG ROADWAYS AND WARN TRAVELERS OF LOW VISIBILITY CONDITIONS. THE PURPOSE OF THE SYSTEM IS TO REDUCE THE NUMBER OF MULTIPLE-VEHICLE COLLISIONS AND CONSEQUENT FATALITIES, INJURIES, AND PROPERTY DAMAGES. THE SYSTEM IS BASED ON AN INNOVATIVE APPROACH TO A WELL-ESTABLISHED ...

    SBIR Phase I 1994 Department of Transportation

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government