You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
OPERATOR-BASED METRIC FOR NUCLEAR OPERATIONS AUTOMATION ASSESSMENT
SBC: CHARLES RIVER ANALYTICS, INC. Topic: N/ATHE OBJECTIVE OF THE PHASE I EFFORT IS TO DEVELOP, IMPLEMENT, AND EVALUATE AN OPERATOR-BASED METRIC FOR ASSESSING FUTURE CONTROL ROOM AUTOMATION SYSTEMS FOR COMMERCIAL NUCLEAR PLANT OPERATIONS. THE FOCUS WILL BE ON AUTOMATION'S IMPACT ON OPERATOR UNDERLOAD AND SITUATION AWARENESS (SA). THE APPROACH COMBINES AN OPERATOR/SYSTEM BEHAVIORAL REPRESENTATION IMPLEMENTEDIN SOFTWARE, WITH A PROCEDURAL METH ...
SBIR Phase I 1993 Nuclear Regulatory Commission -
Self-Monitoring Surveillance System for Prestressing Tendons
SBC: Construction Technology Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
Development of a Performance Assessment Process Controller
SBC: Innovative Tech. Solutions Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
A SIMPLE METHOD FOR SOLUBILITY TESTING OF RADIONUCLIDES ON AIR FILTER
SBC: Radiation Safety Engineering, Inc. Topic: N/AN/A
SBIR Phase I 1993 Nuclear Regulatory Commission -
A HIGH RESOLUTION CDTE ARRAY MONITORING SYSTEM FOR MONITORING CONTAMINATION IN SOILS
SBC: Radiation Safety Engineering, Inc. Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
Inservice Diagnostics of Motor Operated Valves
SBC: ACENTECH INCORPORATED Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS
SBC: Risk Management Systems Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
WORK UNDERLOAD IN MODERN NPP CIBTRIK ROOMS
SBC: UES INC Topic: N/AN/A
SBIR Phase I 1993 Nuclear Regulatory Commission