You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Active Shaping of Terawatt Pulses
SBC: CLARK-MXR, INC. Topic: N/A147 Active Shaping of Terawatt Pulses--Clark-MXR, Inc., P.O. Box 339, Dexter, MI 48130-0339; (313) 426-6265 Dr. Mark Dugan, Principal Investigator Dr. Philippe Bado, Business Official DOE Grant No. DE-FG02-97ER82352 Amount: $74,871 Advanced accelerators for high energy physics research based on high intensity lasers may be significantly less expensive than traditional designs. Consequently t ...
SBIR Phase I 1997 Department of Energy -
Advanced Water Sensor for Unmanned Aerial Vehicles
SBC: SOUTHWEST SCIENCES INC Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
A FIBER OPTIC ARRAY DETECTOR
SBC: Amparo Corp.on Topic: N/AWIRE CHAMBERS ARE A CLASS OF PARTICLE TRACK DETECTORS THAT HAVE FOUND WIDE APPLICATIONS IN HIGH ENERGY PARTICLE PHYSICS EXPERIMENTS. LARGE WIRE CHAMBER DETECTORS HAVE BECOME RATHER COMPLEX, REQUIRING MANY FAST ELECTRONIC CIRCUITS. THIS INVESTIGATION OFFERS THE POTENTIAL OF SIMPLIFICATION AND COST REDUCTION FOR LARGE WIRE CHAMBER DETECTORS. THE PHASE I EFFORT IS INVESTIGATING THE FEASIBILITY OF USI ...
SBIR Phase I 1992 Department of Energy -
A FRAMEWORK FOR A GENERAL PURPOSE INTELLIGENT CONTROL SYSTEM FOR PARTICLE ACCELERATORS
SBC: Vista Control Systems, Inc. Topic: N/AN/A
SBIR Phase I 1994 Department of Energy -
A HIGH POWER SOLID-STATE AMPLIFIER
SBC: Amparo Corp.on Topic: N/AN/A
SBIR Phase I 1994 Department of Energy -
A HIGH POWER THICK TARGET DESIGN FOR IRRADIATION BY HIGH INTENSITY CHARGED PARTICLE BEAMS
SBC: Amparo Corp.on Topic: N/APHASE I ADDRESSES A NEW APPROACH FOR THE DESIGN OF HIGH POWER NUCLEAR TARGETS USED FOR PRODUCTION OF RADIOISOTOPES BY HIGH ENERGY CHARGED PARTICLE BEAMS, NOTABLY HIGH ENERGY PROTONS. SUCH TARGETS WILL YIELD LARGER QUANTITIES OF RADIOACTIVE SPECIES THAN PRESENTLY AVAILABLE, EITHER FOR BASIC RESEARCH (E.G., STUDIES USING RADIOACTIVE BEAMS) OR FOR APPLIED PURPOSES (E.G., PRODUCTION OF MEDICAL RADIOI ...
SBIR Phase I 1994 Department of Energy -
A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles
SBC: Commercial Electronics, Inc. Topic: N/A86 A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles--Commercial Electronics, Inc., 801 North 15th Street, Broken Arrow, OK 74012-2838; (918) 251-0925 Mr. Scott Phillips, Principal Investigator Mr. Michael A. Phillips, Business Official DOE Grant No. DE-FG03-97ER82353 Amount: $75,000 Among the various alternative fuels propos ...
SBIR Phase I 1997 Department of Energy -
A LOW EMISSION ALKALI METAL THERMAL TO ELECTRIC CONVERTER AUTOMOTIVE POWER SYSTEM
SBC: ADVANCED MODULAR POWER SYSTEMS Topic: N/AN/A
SBIR Phase I 1994 Department of Energy -
Alternative Metal Forming Using Laser Engineered Net Shaping
SBC: OPTOMEC, INC. Topic: N/A50 Alternative Metal Forming Using Laser Engineered Net Shaping--Optomec Design Company, 13170 B Central Avenue SE, Suite 310, Albuquerque, NM 87123-3032; (505) 343-9139 Mr. David M. Keicher, Principal Investigator Mr. Thomas A. Swann, Business Official DOE Grant No. DE-FG03-97ER82448 Amount: $74,777 Energy intensive metal forming operations are among the most common steps in manufacturing ...
SBIR Phase I 1997 Department of Energy -
A MULTIMEDIA TUTORIAL FOR CHARGED-PARTICLE BEAM DYNAMICS
SBC: Whistlesoft Inc. Topic: N/AN/A
SBIR Phase I 1994 Department of Energy