You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A FUEL/AIR DRIVE FLUX COMPRESSOR POWER UNIT FOR ELECTROTHERMAL GUNS
SBC: KTECH CORP. Topic: N/AThe Ktech Team proposes a feasibility study of a fuel/air driven flux compression power unit (FCPU) for electric guns. Through variations of inductance gradients and through changes in scale, the proposed technology will be applicable to both electrothermal/chemical and electromagnetic guns. In the Phase 1 effort, we develop simulation models to predict the performance of the flux compression po ...
SBIR Phase I 1996 Department of DefenseDefense Threat Reduction Agency -
A HIGH RESOLUTION CDTE ARRAY MONITORING SYSTEM FOR MONITORING CONTAMINATION IN SOILS
SBC: Radiation Safety Engineering, Inc. Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
A Megapixel Gamma Camera for Arms Control Verification
SBC: LEXITEK INC Topic: N/ALexitek proposes to develop an imaging gamma-ray detector with 1024 x 1024 pixels for arms control verification. The proposed detector significantly enhances the resolution of fissionable material distribution without compromising energy resolution. The detector consists of a scintillating crystal and associated sensors which determine the energy and position of the scintillation with high spat ...
SBIR Phase I 1997 Department of DefenseDefense Threat Reduction Agency -
AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER
SBC: W Peter Trower Inc. Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
A Portable Gamma Spectrometer with a High Resolution CdTe Array Detector
SBC: Radiation Safety Engineering, Inc. Topic: N/AN/A
SBIR Phase I 1994 Department of DefenseDefense Threat Reduction Agency -
Batteryless Sensors for Intrusion Detection and Assessment of Threats
SBC: Anro Engineering, Inc. Topic: N/AN/A
SBIR Phase I 1994 Department of DefenseDefense Threat Reduction Agency -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
Electrostatic Supercapacitor
SBC: SIGMA TECHNOLOGIES INTERNATIONAL GROUP, INC. Topic: N/AN/A
SBIR Phase I 1996 Department of DefenseDefense Threat Reduction Agency -
EMP AND HPM SUPPRESSION TECHNIQUES
SBC: Integrated Sciences Topic: N/ASurvival of present day microelectronic circuits depends on their protection from self generated and external electromagnetic interference. This proposal is oriented toward the class of interference generally referred to as overvoltage transients. Means for mitigating these transients include gas discharge tubes, and various solid state devices. Each of these has their own advantages in particu ...
SBIR Phase I 1996 Department of DefenseDefense Threat Reduction Agency -
FAST-RISE HIGH PRESSURE GAUGE FOR LONG-DURATION NUCLEAR AIRBLAST
SBC: KTECH CORP. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency