List
The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.
-
IN-SITU OPTICAL DIAGNOSIS AND CONTROL OF PULSED LASER DEPOSITION OF HIGH TC SUPERCONDUCTOR THIN FILMS
SBC: Advanced Fuel Research, Inc. Topic: N/AALTHOUGH MANY POTENTIAL TECHNOLOGIES EXIST FOR DEPOSITING EXOTIC THIN FILM DEVICES, CONTROLLING THE MATERIAL PROPERTIES HAS BEEN A MAJOR STUBLING BLOCK TO ACHIEVING SUCCESSFUL AND REPRODUCIBLE DEVICE PROPERTIES. IN THE CASE OF PULSED LASER DEPOSITION (PLD) OF HIGH TC SUPERCONDUCTOR FILMS, THE EMISSION OF THE PLASMA CAN BE CORRELATED WITH THE QUALITY OF FILMS DEPOSITED. BUT THIS MEASUREMENT PROVIDE ...
SBIR Phase II 1994 Department of Commerce -
ADVANCED INFRARED SYSTEMS FOR DETECTION OF BUILDING FIRES
SBC: Advanced Fuel Research, Inc. Topic: N/AN/A
SBIR Phase I 1994 Department of Commerce -
Optical Water Level Sensor
SBC: CIENCIA INC Topic: N/ADevelopment of an optical water level sensor is proposed to solve some of the problems and limitations of current sounding tube/protective well acoustic sensors. By using light instead of sound, temperature gradient effects on the measurement are obviated. Furthermore, the proposed system eliminates the need for a sounding tube, protective well and associated temperature sensors, and does not requ ...
SBIR Phase II 1998 Department of Commerce -
NO MOVING PARTS RAIN GAUGE
SBC: THE CORE GROUP, INC. Topic: N/ATHE U.S. WEATHER SERVICE PRESENTLY USES A "TIPPING BUCKET" RAIN GAUGE FOR MEASURING RAIN ACCUMULATION. THIS DEVICE IS SENSITIVE TO WIND AND MOTION (AS ON BUOYS), CANNOT MEASURE RAIN RATE, AND REQUIRES FREQUENT MAINTENANCE, BECAUSE OF MOVING PARTS. AN ALTERNATIVE DEVICE IS BEING PROPOSED, WHICH INCORPORATES A RIGID, RESONANT TUBE, CLOSED AT THE TOP BY AN ELECTRO-ACOUSTIC TRANSDUCER, AND AT THE BOTT ...
SBIR Phase I 1994 Department of Commerce -
Analysis Software for Near-Field Optical Microscopes
SBC: Field Precision Topic: N/AThe near-field scanning optical microscope can supply information on the shape and electrical properties of surfaces with nanometer resolution. The quantitative interpretation of images is difficult because of the difficulty of electromagnetic field solutions in the near-field limit. We propose to supply software to aid in this analysis. The finite-element programs generate two and three-dimension ...
SBIR Phase II 1998 Department of Commerce -
A Virtual Machining and Inspection System (VMIS)
SBC: Icamp, Inc. Topic: N/AThe purpose of the VMIS is to allow manufacturers the luxury of testing and perfecting manufacturing plans long before a single machine tool is turned on and resources are committed. The VMIS will allow the user to select an available machine tool and an available inspection device, specify a proposed inspection plan and a dimensional analysis procedure, and then build and inspect hundreds (or ev ...
SBIR Phase II 1996 Department of Commerce -
New Methods for Evaluating Thermal Performance of Protective Clothing for
SBC: KTECH CORP. Topic: N/AA growing number of fire fighters are suffering third degree burns; this has led to questions about the adequacy of thermal protective performance (TPP) measurements for protective clothing. A new heat flux sensor, whose response approximates that of skin, will be developed to provide better measurements of heat transfer in TPP tests. This sensor will be used with nonlinear parameter estimation an ...
SBIR Phase II 1998 Department of Commerce -
ROBUST DESIGN ENGINEERING WORKSTATION
SBC: MANAGEMENT SCIENCES INC Topic: N/AMSI PROPOSES TO INCORPORATE BACKGROUND SUBSTITUTION OF "FAULTY MODELS" IN CAD DESIGN SIMULATION OF ELECTRONIC CIRCUITS TO PERFORM A "DESIGN OF EXPRIMENTS" DETERMINATION OF SENSITIVITY TO PARAMETRIC VARIATION IN COMPONENTS. THE INFORMATION LEARNED WILL BE USED TO SELECT COMPONENTS THAT WILL HAVE A LONGER LIFE, AND GREATER DURABILITY. THIS FORM OF ANALYSIS COMBINED WITH WORST CASE SENSITIVITY ANALYS ...
SBIR Phase I 1994 Department of Commerce -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
Atmospheric and Hydrological Sciences
SBC: Pmd Scientific, Inc. Topic: N/AMeasurement and real-time telemetry of tsunami wave runup height data provides an important component of the overall threat estimate at tsunami warning centers. However, there are no commercially available devices which could furnish this information. Thus, the proposed is an R&D program aimed at the development of an inexpensive, "intelligent", accurate water level data transmitter based on the ...
SBIR Phase II 1996 Department of Commerce