You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Data Fusion for Timely Screening of Treaty Verification Data
SBC: ABTECH CORPORATION Topic: N/AN/A
SBIR Phase I 1995 Department of Energy -
LANDFILL GAS CONVERSION TO A CONTAMINANT-FREE METHANE-CARBON DIOXIDE REFORMER FEEDSTOCK FOR METHANOL SYNTHESIS
SBC: Acrion Technologies, Inc. Topic: N/AN/A
SBIR Phase I 1994 Department of Energy -
Solid Free-Body Formed Alumina-Tungsten Electrode Insulators for Heavy Ion Fusion Accelerators
SBC: Sensintel Inc. Topic: N/AN/A
SBIR Phase I 1995 Department of Energy -
Template-Medicated Synthesis of Periodic Membranes for Improved Liquid-Phase Separations
SBC: American Research Corporation of Virginia Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
A Fuzzy Expert Systems-Based Standard Generalized Markup Language Interface for Access and Collaborative Authoring of Multi-Domain Technical Documents on a Wide Area Network
SBC: American Research Corporation of Virginia Topic: N/AN/A
SBIR Phase I 1995 Department of Energy -
A URANIUM CARBIDE/RHENIUM THERMIONIC FUEL ELEMENT
SBC: Applied Sciences Inc. Topic: N/AA THERMIONIC FUEL ELEMENT (TFE) BASED ON ADVANCED URANIUM CARBIDE (UC) SOLID SOLUTION FUEL WITH RHENIUM EMITTER CLADDING SHOULD ALLOW MUCH BETTER PERFORMANCE THAN PRESENT DESIGNS. THE FUEL FORM WOULD BE A LONG, THIN, HOLLOW "VERMICELLI" SHAPE TO ALLOW VERY COMPACT REACTORS TO BE DESIGNED, DESPITE THE HIGH NEUTRON ABSORPTION CROSS SECTION OF RHENIUM. RHENIUM IS EXPECTED TO BE COMPLETELY COMPATIBLE ...
SBIR Phase I 1992 Department of Energy -
Use of Coal Fines for Production of Clean Fuel and Vapor-Grown Carbon Fiber
SBC: Applied Sciences Inc. Topic: N/AN/A
SBIR Phase I 1995 Department of Energy -
REFRACTORY METAL COATINGS ON CARBON/CARBON COMPOSITES FOR FIRST WALL APPLICATIONS
SBC: Applied Sciences Inc. Topic: N/AN/A
SBIR Phase I 1992 Department of Energy -
Controlled Atmosphere Plasma Spraying of NdFeB Magnet Materials
SBC: APS Materials, Inc. Topic: N/A53 Controlled Atmosphere Plasma Spraying of NdFeB Magnet Materials--APS Material, Inc., 4011 Riverside Drive, Dayton, OH 45405-2364; (937) 278-6547 Mr. Michael C. Wilson, Principal Investigator Mr. Joseph T. Cheng, Business Official DOE Grant No. DE-FG02-97ER82328 Amount: $75,000 Permanent magnet materials with improved properties are needed for a variety of applications ranging from large ele ...
SBIR Phase I 1997 Department of Energy -
FEASIBILITY OF AN ULTRA-CENTRIFUGE FOR DRYING COMMINUTED DEEP CLEANED COAL
SBC: Coal Tech Corp. Topic: N/ATHE DEEP CLEANING PROCESSES NOW UNDER INVESTIGATION FOR COAL MOST OFTEN INVOLVE PULVERIZING AND THE USE OF A LIQUID PROCESS MEDIUM. IF THE VERY FINE DEEP CLEANED COAL IS TO BE USED IN A DRY FORM, A SATISFACTORY DRYING TECHNOLOGY IS VITAL. PREVIOUS STUDIES HAVE INDICATED A SUBSTANTIAL PROBABILITY OF SUCCESS IF THE ULTRAHIGH LEVELS OF CENTRIFUGE GRAVITY ARE COMBINED WITH THE CENTRIFUGAL DECANTING/FI ...
SBIR Phase I 1992 Department of Energy