You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A COMPACT SIMULATOR FOR TRAINING OF OPERATORS AND MAINTENANCE PERSONNEL

    SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA            Topic: N/A

    TII SHALL PROCURE, DESIGN, CONSTRUCT, AND TEST A COMPACT PORTABLE SIMULATOR CAPABLE OF EMULATING NUCLEAR POWER STATION-OPERATOR (NPS-OP) INTERFACES, AND EVALUATE AND TEST VARIOUS INTERFACE DESIGNS. THE SUMULATOR WILL BE DESIGNED FOR OPERATOR TRAINING ON ADVANCED REACTORS AND WILL BE USED IN SIMULATING OPERATORS SCENARIOS AND RECORDING AND DOCUMENTING REAL-TIME INPUT FROM THE OPERATOR. THE SIMULATO ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  2. A Long-Life, Low-Cost Sorbent for the Conversion of HCl to Chlorine

    SBC: TDA RESEARCH, INC.            Topic: N/A

    The U.S. demand for chlorinated hydrocarbons exceeds 15 million tons annually. The production of these chemicals requires chlorine (Cl2) and produces HCl as an unavoidable by-product. Stringent environmental regulations limit the shipment of hazardous wastes like HCl, and the disposal of HCl by neutralization is costly. A consortium of 15 companies is developing an in-process recycling system t ...

    SBIR Phase I 1997 Environmental Protection Agency
  3. A Low Cost, Long Life Zinc Oxide Based Sorbent

    SBC: TDA RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1994 Environmental Protection Agency
  4. An Automated Electrophoretic Mobility Instrument for Coagulant Dose Control

    SBC: Clear Corporation            Topic: N/A

    Drinking water filtration plants nationwide are failing to adequately reduce the public health risk due to exposure to sometimes lethal Cryptosporidium and other microbial particle levels. New regulations also will require reduction of dissolved organic carbon (DOC) to minimize the risk from potentially carcinogenic reaction by-products resulting from disinfection. Particle and DBP precursors ar ...

    SBIR Phase I 1997 Environmental Protection Agency
  5. A NEW CHARGE BASED COAGULANT DOSE CONTROL INSTRUMENT

    SBC: Clear Corporation            Topic: N/A

    N/A

    SBIR Phase I 1994 Environmental Protection Agency
  6. AN IMPROVED NOXSO PROCESS

    SBC: TDA RESEARCH, INC.            Topic: N/A

    Coal is the largest source of power generation in the U.S.A. but its conbustionproduces SOx and NOx which must be removed from the flue gas. Current removaltechniques (limestone base Flue Gas Desulfurization and Selective CatalyticReduction) are effective but expensive due to the large amouth of sorbentconsumed. The leading regenerable process is the NOXSO process, which wses asodium aluminate s ...

    SBIR Phase I 1995 Environmental Protection Agency
  7. An Improved NOXSO Sorbent for the Removal of NOx and Sox from Flue Gas

    SBC: TDA RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Environmental Protection Agency
  8. A NOVEL APPROACH FOR ENHANCING IN-SITU BIOREMEDIATION OF TRICHLOROETHYLENE

    SBC: Geo-microbial Technologies, In            Topic: N/A

    TRICHLOROETHYLENE (TCE) IS A WIDESPREAD POLLUTANT AND IS REPORTED TO BE THE MOST FREQUENTLY ENCOUNTERED CONTAMINANT AT HAZARDOUS WASTE SITES. ALL PREVIOUS ATTEMPTS AT IN SITU BIOREMEDIATION HAVE USED A PROCESS WHERE METHANTROPHIC BACTERIA WERE STIMULATED BY THE SUBSURFACE DELIVERY OF AIR AND METHANE RESULTING IN A "FORTUITOUS" COMETABOLISM OF TCE. THIS PROCESS AT ONE TIME APPEARED PROMISING FOR TH ...

    SBIR Phase I 1992 Environmental Protection Agency
  9. A Novel Extractant for the Selective Removal of Arsenic from Industrial Wastewaters

    SBC: TDA RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1994 Environmental Protection Agency
  10. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government