You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. VALIDATION & TESTING OF THE VAM2D COMPUTER CODE

    SBC: Hydrogeologic Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  2. Development of a Performance Assessment Process Controller

    SBC: Innovative Tech. Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  3. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  4. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    WE PROPOSE TO EXPLOIT THE PROPERTIES OF OUR NEW, FAST, BRIGHT SCINTILLATOR, YAIO3:CE(+3) (YAP), TO CONSTRUCT A DETECTOR FOR PHOTONS WITH ENERGIES FROM 20 KEV TO 3 MEV. AN ARRAY OF THESE INDIVIDUAL DETECTORS WILL SERVE AS THE BASIS FOR A BROAD-BAND Y-RAY DOSIMETER CAPABLE OF MEASURING EXPOSURES FROM 5 MR/H TO 1 R/H AND EQUIVALENT DOSES FROM 5 X 10(-2) TO 10 (+4) MSV/H. THEA ADVANTAGES OF YAP SCINTI ...

    SBIR Phase II 1995 Nuclear Regulatory Commission
  5. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    THIS PROJECT IS AIMED AT DEVELOPING TECHNIQUES FOR PREDICTING CHECK VALVE PERFORMANCE AND ITS INTERNAL COMPONENTS DEGRADATION IN PRACTICAL PIPING SYSTEMS USED IN NUCLEAR POWER PLANTS. THE MAIN FOCUS OF THE EFFORT IS TO SYSTEMATICALLY EVALUATE THE EFFECT OF UPSTREAM DISTURBANCES WHICH ARE WITHIN 10 DIAMETERS UPSTREAM. BY USING A COMBINED THEORETICAL AND EXPERIMENTAL APPROACH, GENERALIZED NONDIMENSI ...

    SBIR Phase II 1988 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government