You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
-
EFFECT OF AGING ON RESPONSE TIME OF NUCLEAR PLANT PRESSURE SENSORS
SBC: ANALYSIS AND MEASUREMENT SERVICES CORPORATION Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
VALIDATION & TESTING OF THE VAM2D COMPUTER CODE
SBC: Hydrogeologic Inc. Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
DEV OF A LARGE CROSS SECTIONAL AREA SELF-POWERED DETECTOR
SBC: K E M P CORP Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS
SBC: Risk Management Systems Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
INSTRUMENTS BASED ON THE SEEBECK EFFECT HAVE BEEN USED SUCCESSFULLY IN EUROPE AND THE UNITED STATES TO IDENTIFY ALLOYS THAT HAVE BEEN HARDENED BY HEAT TREATMENT OR COLD WORKING.
SBC: Salvonics Inc. Topic: N/AINSTRUMENTS BASED ON THE SEEBECK EFFECT HAVE BEEN USED SUCCESSFULLY IN EUROPE AND THE UNITED STATES TO IDENTIFY ALLOYS THAT HAVE BEEN HARDENED BY HEAT TREATMENT OR COLD WORKING. BECAUSE THE RESULTS OF RADIATION DAMAGE, INCREASED YIELD STRENGTH AND DECREASED TOUGHNESS ARE SIMILAR, AN INVESTIGATION IS PROPOSED TO EXAMINE THE FEASIBILITY OF USING THE SEEBECK EFFECT IN THE ASSESSMENT OF RADIATION DAMA ...
SBIR Phase I 1984 Nuclear Regulatory Commission