You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. BWR RECIRCULATION INLET SAFE ENDS-A THREAT TO PLANT LIFE ANDSAFETY

    SBC: Aptech Engineering Services            Topic: N/A

    AN ON-GOING THREAT TO THE RESIDUAL LIFETIME AND SAFETY OF BOILING WATER REACTORS (BWRS) IS INTERGRANULAR STRESS CORROSION CRACKING (IGSCC). A COMPONENT OF SPECIAL CONCERN IN THE RECIRCULATION INLET NOZZLE SAFE END (RINSE). FOR EXAMPLE, WITHIN THE LAST 2 YEARS 30 OUT OF 30 RINSES ARE KNOWN TO BE CRACKED AT A 3-UNIT BWR SITE AND IT IS BELIEVED THAT 20 OUT OF 20 RINSES ARE CRACKED AT A 2-UNIT BWR SIT ...

    SBIR Phase I 1989 Nuclear Regulatory Commission
  2. SEISMIC PRA

    SBC: Future Resources Associate Inc            Topic: N/A

    N/A

    SBIR Phase I 1983 Nuclear Regulatory Commission
  3. PRESSURIZED WATER REACTOR TRANSIENT ANALYSIS MODEL

    SBC: Levy S Inc            Topic: N/A

    N/A

    SBIR Phase I 1983 Nuclear Regulatory Commission
  4. STUDY ON AVAILABILITY AND COMPOSITION OF METAL BEARING WASTES

    SBC: N.h. Parker, P.e. And            Topic: N/A

    N/A

    SBIR Phase I 1983 Nuclear Regulatory Commission
  5. DEVELOPMENT OF A REAL TIME LONG RANGE RADIOACTIVE PLUME TRANSPORT SIMULATION MODEL

    SBC: PHYSICAL RESEARCH, INC.            Topic: N/A

    THE FEASIBILITY OF DEVELOPMENT OF A NEW LONG RANGE RADIOACTIVE PLUME TRANSPORT CODE IS PROPOSED. NEW APPROACHES TO ESTIMATE THE RADIOACTIVE DECAY, WET AND DRY DEPOSITION, PARTICULATE COAGULATION, AND ATMOSPHERIC PARAMETERS WILL BE EXPLORED AND A SIMPLE, IDEALIZED EVALUATION OF THESE ALGORITHMS WILL BE MADE IN PHASE I OF THE PROPOSED EFFORT. BASED ON THESE STUDIES A) AN APPROPRIATE NEAR SOURCE RISE ...

    SBIR Phase I 1989 Nuclear Regulatory Commission
  6. QUANTITATIVE EFFECTS OF WORKER/DOSIMETER GEOMETRY ON DOSE MEASUREMENT

    SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA            Topic: N/A

    WORKER/DOSIMETER (W/D) GEOMETRY AND RELATIONSHIP TO A SOURCEOF RADIATION CAN PROVIDE FALSE RECORDING OF THE RADATION DOSE RECEIVED BY AN INDIVIDUAL. HENCE, TECHNOLOGY INTERNATIONAL INCORPORATED (TII) IS PROPOSING A TWO PHASE EFFORT WHICH INVOLVES A COMPUTER SIMULATION EXPERIMENT USING GEOMETRIC MODELING IN CONJUNCTION WITH A DOSE COMPUTATION ALGORITHM, FOLLOWED BY PERFORMANCE OF EXPERIMENTEMPLOYIN ...

    SBIR Phase I 1989 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government