You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. VALIDATION & TESTING OF THE VAM2D COMPUTER CODE

    SBC: Hydrogeologic Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  2. SMART SENSORS USING OPTICAL FIBER INTERCONNECTS AND DISTRIBUTED MEMS

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  3. Small Lot Repair/Manufacture of Microcircuit Boards by Laser Deposition

    SBC: Cm Consulting            Topic: N/A

    The final prototype of the Microcircuit Board Repair apparatus will be capable of laying down or lifting metal strips with micrometer dimensions. Under real time computer control, the translation stages will be fully automated or manually controlled. The end user will monitor the process in real time using a camera attached with the source. Laying down the metal lines will be done using Laser C ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  4. Representation and Transmission of Non-Visual Stimuli Using the HLA

    SBC: Mystech Assoc., Inc.            Topic: N/A

    This effort will develop an HLA compliant representation of non-visual stimuli with the intention of utilizing the models developed in Phase I effort to provide data for "human" mannequin stimulation in Phase II. The Phase II goal is to have the mannequin respon in a physiologically realistic manner to the non-visual stimuli data that will be passed to it over a network and via an interface. Suc ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  5. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  6. Porous Sol-Gel Derived Ceramic Release Agent

    SBC: TPL, INC            Topic: N/A

    Breathable release coatings that can withstand processing conditions up to 750F are needed for use on ceramic tooling. In situ removal of volatiles in solvent-based composite processing is a critical issue that will enable production of high quality parts at lower cost per part. Current release coatings meet neither the temperature nor the solvent transport requirements of solvent-based composit ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  7. Parallel Optical Memory Interconnects

    SBC: LSA            Topic: N/A

    In this proposal, we describe a novel approach for realizing a parallel, nonmechical, read/write interconnection for angle-multiplexed three-dimensional (3-D) optical memories. Our concept represents a significant first step required toward taking this critical memory technology from the laboratory and inserting it into operational systems. The concept utilizes novel optomechanical packaging and ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  8. Optical Fiber-Based Corrosion System Using Electrochemically Active Coatings

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: N/A

    The objective of the proposed program is to address the high service costs of the current U.S. Navy fleet of aircraft by developing a distributed optical fiber sensor system that will help reduce the costs associated with corrosion damage and extend the lifetime of existing aircraft. Annual corrosion of Navy metallic structures has been estimated as high as $1 billion. Additional costs aris ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  9. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  10. Liquid Crystal-Based Underwater Imager

    SBC: EMPIRICAL TECHNOLOGIES CORPORATION            Topic: N/A

    The contractor proposes a new approach to underwater imaging that directly converts a two-dimmensional acoustic pressure wave into an electronic requirements fo convential piezo-element arrays. The imager relies on the piezo-birefringent properties of a nematic liquid crystal panel that serves as both sensor and display. The capability of nematic liquid crystals has been established and publishe ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government