You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES

    SBC: Future Resources Associate Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  2. IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS

    SBC: Kalsi Engineering, Incorporated            Topic: N/A

    MOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  3. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  4. PROBABILITY OF FLOODS WITH VERY LONG RETURN PERIODS

    SBC: Linsley Kraeger Associates Ltd            Topic: N/A

    N/A

    SBIR Phase I 1984 Nuclear Regulatory Commission
  5. LONG RANGE RADIOACTIVE PLUME TRANSPORT SIMULATION MODEL/CODE

    SBC: Sigma Research Corp            Topic: N/A

    THE OBJECTIVE OF THE PHASE I RESEARCH IS TO DETERMINE THE TECHNICAL FEASIBILITY OF THE DEVELOPMENT OF A LONG RANGE RADIOACTIVE PLUME TRANSPORT MODEL/CODE FOR THE NRC. THIS CODE WOULD BE USED TO SIMULATE THE MOVEMENT, DISPERSION, DECAY, AND DEPOSITION OF RADIONUCLIDES RELEASED FROM SEVERE NUCLEAR REACTOR ACCIDENTS, SUCH AS THE CHERNOBYL ACCIDENT. IT IS DESIRED THAT ALL RELEVANT PHYSICAL AND CHEMICA ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  6. Integrated Risk Management and Quality Assurance

    SBC: Accident Prevention Group            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  7. Extending the Dynamic Flowgraph Methodology (DFM) to Model Human Performance and Team Effects

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  8. Development of a Performance Assessment Process Controller

    SBC: Innovative Tech. Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  9. Inservice Diagnostics of Motor Operated Valves

    SBC: ACENTECH INCORPORATED            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  10. GAMMA RAY SPECTROMETER/DOSIMETER

    SBC: Applied Inventions Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government