You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Wearable Electronics for Man Machine Interfaces

    SBC: CARLOW INTERNATIONAL, INC.            Topic: N/A

    Computing technology (as well as control and display technology) is rapidly becoming more powerful, miniaturized and wearable. These trends will allow Navy personnel to be increasingly mobile, not tethered to hardwired console and computer systems. In conjunction with wearable display systems, wireless LANs, and alternative control mechanisms (such as voice recognition), system operators may, ...

    SBIR Phase I 1996 Department of DefenseNavy
  2. WARFARE SYSTEMS ARCHITECTURES

    SBC: Logi-tech Engineering Resource            Topic: N/A

    A REVISED ARCHITECTURE CONCEPT FOR ASW INFORMATION MANAGEMENT BY REDUCING SHORE-TO-SHIP AND INTER-PLATFORM DATA TRANSMISSION TIME AND BANDWIDTH REQUIREMENTS THROUGH COST EFFECTIVE MANAGEMENT OF INFORMATION IS NOW POSSIBLE. APPLICATION OF THE INFORMATION MANAGEMENT METHODOLOGY TO THE STORAGE, RETRIEVAL, AND TIMELY PRESENTATION OF COHERENT TACTICAL PICTURES WILL BE IMPORTANT BY-PRODUCTS. PROPER INFO ...

    SBIR Phase I 1990 Department of DefenseNavy
  3. Volatile Non-Toxic Compounds as Fuel Combustion Inhibitors

    SBC: TPL, INC            Topic: N/A

    Weapon payloads are needed to degrade an adversary's military capability while minimizing the destructive effect on civilian populations. A payload which inhibits operation of internal combustion engines while having no destructive impact on human beings would meet a variety of non-lethal weapon requirements. Immobilization of engines by uptake of fuel combustion inhibitor (FCI) compounds, tailor ...

    SBIR Phase I 1996 Department of DefenseNavy
  4. VOICE RECOGNITION TECHNOLOGY APPLIED TO MULTIPLE SOI RECOGNITION

    SBC: Spectrum Management Gp Inc.            Topic: N/A

    OUR FIRM GAINED EXPERIENCE IS CHARACTERIZING AND CLASSIFYING VOICE INPUT IN RECENT SBIR PROJECTS. THE TECHNOLOGY WE DEMONSTRATED APPEARS TO US TO BE ADAPTABLE TO THE DESCRIBED MULTIPLE SOI RECOGNITION PROBLEM. WE PROPOSE IN THIS PROJECT TO DO THE INITIAL DEVELOPMENT AND BUILD A DEMONSTRATION.

    SBIR Phase I 1990 Department of DefenseNavy
  5. VME bus Reliability/Test Tools

    SBC: PROGENY SYSTEMS, LLC            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseNavy
  6. VHDL SIMULATION FOR ADA SYSTEMS

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    WE PROPOSE A GENERIC METHODOLOGY FOR SIMULATING MICROPROCESSOR BEHAVIOR IN AN ADA ENVIRONMENT VHDL SPECIFICATION OF THE MICROPROCESSOR CHARACTERISTICS.

    SBIR Phase I 1990 Department of DefenseNavy
  7. ULTRA-WIDE BAND MODULAR SOLID-STATE TRANSMITTER ARRAY FOR NAVAL ELECTRONIC WARFARE

    SBC: System Planning Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseNavy
  8. UAV-Hosted UltraShort Pulse Ground Penetrating Radar

    SBC: Barrett, Terence William            Topic: N/A

    A ground penetrating radar (GPR) with advanced processing techniques is proposed for unmanned aerial vehicle mounting. The radar will have two modes of functioning: (A) detection mode, and (B) imaging mode. Precise position accuracy is required for a gridwork of multiple probings and GPS P-Code can provide sub-meter location accuracy. The system design will take advantage of recent develo ...

    SBIR Phase I 1996 Department of DefenseNavy
  9. Towed Array Technology Communication Link Bandwidth Expansion

    SBC: PLANNING SYSTEMS, INC.            Topic: N/A

    We present an innovative design to achieve full-duplex ATM telemetry over existing single-coax tow cable systems which are used on many Navy ships and submarines for towing arrays. The proposal includes a comprehensive review of wireline standards, semiconductors, and modems from which we identify three enabling technologies to achieve full-duplex ATM links on single-coax tow cables: wireline ...

    SBIR Phase I 1997 Department of DefenseNavy
  10. TOTAL QUALITY MANAGEMENT (TQM) CONTROL CRITERIA APPLIED TO LONG TERM TEST PROGRAMS

    SBC: SIGMA SYSTEMS RESEARCH, INC.            Topic: N/A

    THIS PROPOSAL BRINGS TOGETHER, IN A SMALL COMPANY ENVIRONMENT, A COMPREHENSIVE TEAM OF EXPERTS TO DIRECTLY APPLY TOTAL QUALITY MANAGEMENT (TQM) PRINCIPLES TO TOMAHAWK OPERATIONAL TEST LAUNCH (OTL) PROCESSES. IT PROVIDES FOR STRUCTURING TEST PROGRAMS TO IMPROVE TESTING QUALITY, PROVIDE FOR MORE EFFECTIVE RESOURCE UTILIZATION AND INCREASE TEST PROCESS COST EFFECTIVENESS. WE APPLY STRUCTURED ANALYTIC ...

    SBIR Phase I 1990 Department of DefenseNavy
US Flag An Official Website of the United States Government