You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Extending the Dynamic Flowgraph Methodology (DFM) to Model Human Performance and Team Effects

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  2. Slowdown, goddammit

    SBC: CONTINENTAL CONTROLS AND DESIGN, INC.            Topic: N/A

    Early in Phase I of this project we begin testing and can deliver a n extremely flexible prototype helmsman's vertical acceleration display and recording system. This low cost marinized PC based device can present acceleration historiesof any position of the boat in multiple formats on a high resolution sunlight readable display. Like an aircraft "black box", but with more memory, it can archive ...

    SBIR Phase I 1997 Department of DefenseSpecial Operations Command
  3. Miniature RF Receiving Antennas

    SBC: Delfin Systems            Topic: N/A

    The Phase I technical objective is to design a series of small receiving antennas which operate in the HF, VHF, and UHF frequency ranges (approximately 1 MHz to 1500 MHz) and then to build and test prototypes of the designs. The antennas are physically small in size and man-packable. Conventional antenna design approaches have constraints which can result in physically large structures, especially ...

    SBIR Phase II 1996 Department of DefenseSpecial Operations Command
  4. SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES

    SBC: Future Resources Associate Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  5. Very Shallow Water Mine Countermeasures Diver Sonar-Lidar Sensor

    SBC: Hendrickson & Associates            Topic: N/A

    Currently an effective diver mine imaging sensor for use in VSW mine reconnaissance does not exist. The SBIR topic requests a capability to locate and image mine targets within a 45 deg wide x 10 deg high field-of-view and to image targets with a resolution of at least 3" at a range of 20 yards. An acoustic lens sonar is a preferred technical approach. Both an acoustic lens sonar and a more compac ...

    SBIR Phase II 1996 Department of DefenseSpecial Operations Command
  6. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  7. DEVELOPMLENT OF A LAUNDRY MONITOR FOR DETECTION OF HOT PARTICLE CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    TWO APPROACHES WILL BE EXAMINED TO SIGNIFICANTLY IMPROVE THESENSITIVITY OF LAUNDRY MONITORS TO DETECT AND SPECIFY LOCATION OF HOT PARTICLES ON LAUNDERED GARMENTS. THESE PROPOSED TECNIQUES HAVE HIGH POTENTIAL FOR DETECTING BOTH LOW ENERGY BETA AND ALPHA PARTICLE RADIATION AS WELL AS IMPROVING SENSITIVITY BY REDUCING BACKGROUND COUNT RATE.

    SBIR Phase II 1990 Nuclear Regulatory Commission
  8. IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER

    SBC: Shonka Research Associates            Topic: N/A

    THE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  9. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  10. Man Personal Dual-Band Miniature Beacon

    SBC: SIERRA MONOLITHICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government