You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY22 is not expected to be complete until September, 2023.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. A QUICK DIAGNOSTIC TEST TO DETECT A DEADLY BACTERIA INFECTING CHANNEL CATFISH

    SBC: Athens Research And Technology            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of Agriculture
  2. HIGH RESOLUTION SOIL WATER CONTENT PROFILING

    SBC: Intercomp            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of Agriculture
  3. AN INNOVATIVE COMPUTERIZED RURAL INFORMATION SYSTEM

    SBC: Republic Data Systems Inc            Topic: N/A

    LOCAL GOVERNMENTS AND PUBLIC INSTITUTIONS IN RURAL AREAS DO NOT HAVE EQUAL ACCESS TO INFORMATION ABOUT OPPORTUNITIES FOR COMMUNITY DEVELOPMENT. ASIDE FROM THE CATALOG OF FEDERAL DOMESTIC ASSISTANCE THERE IS NO STRUCTURED WAY IN WHICH TO FIND OUT ABOUT FUNDING FROM A VARIETY OF FEDERAL SOURCES. STATE AND PRIVATE SOURCES OF FUNDING ARE NOT AVAILABLE IN ANY MEANINGFUL, ACCESSIBLE WAY. THE OBJECTIVE O ...

    SBIR Phase I 1989 Department of Agriculture
  4. DEVELOPMLENT OF A LAUNDRY MONITOR FOR DETECTION OF HOT PARTICLE CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1989 Nuclear Regulatory Commission
  5. QUANTITATIVE EFFECTS OF WORKER/DOSIMETER GEOMETRY ON DOSE MEASUREMENT

    SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA            Topic: N/A

    WORKER/DOSIMETER (W/D) GEOMETRY AND RELATIONSHIP TO A SOURCEOF RADIATION CAN PROVIDE FALSE RECORDING OF THE RADATION DOSE RECEIVED BY AN INDIVIDUAL. HENCE, TECHNOLOGY INTERNATIONAL INCORPORATED (TII) IS PROPOSING A TWO PHASE EFFORT WHICH INVOLVES A COMPUTER SIMULATION EXPERIMENT USING GEOMETRIC MODELING IN CONJUNCTION WITH A DOSE COMPUTATION ALGORITHM, FOLLOWED BY PERFORMANCE OF EXPERIMENTEMPLOYIN ...

    SBIR Phase I 1989 Nuclear Regulatory Commission
  6. FIBER-OPTIC BIOSENSORS IN FOOD ANALYSIS

    SBC: Universal Sensors, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of Agriculture
  7. DEVELOPMENT OF A DEEP BOREHOLE PERMEAMETER TO DETERMINE UNSATURATED HYDRAULIC PROPERTIES DEVELOPMENT OF A DEEP BOREHOLE PERMEAMETER TO DETERMINE UNSATURATED HYDRAULIC PROPERTIES

    SBC: Daniel B. Stephens & Associates, Inc.            Topic: N/A

    PREDICTING THE RATE OF SOIL WATER MOVEMENT AND THE IMPACT OFAGRI-CHEMICALS ON WATER RESOURCES IS VITALLY IMPORTANT TO MANAGING AGRICULTURE, FOR OPTIMIZING PRODUCTIVITY AND MINIMIZING ENVIRONMENTAL IMPACT. SOPHISTICATED MODELS FOR MAKING SUCH PREDICTIONS ARE AVAILABLE, BUT DATA ON SOIL HYDRAULIC PROPERTIES ARE DIFFICULT AND OFTEN EXPENSIVE TO OBTAIN. IN FACT, AT DEPTHS BELOW THE ROOT ZONE THERE IS ...

    SBIR Phase I 1990 Department of Agriculture
  8. IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS

    SBC: Kalsi Engineering, Incorporated            Topic: N/A

    MOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  9. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  10. IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER

    SBC: Shonka Research Associates            Topic: N/A

    THE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government