You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Extending the Dynamic Flowgraph Methodology (DFM) to Model Human Performance and Team Effects

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  2. Slowdown, goddammit

    SBC: CONTINENTAL CONTROLS AND DESIGN, INC.            Topic: N/A

    Early in Phase I of this project we begin testing and can deliver a n extremely flexible prototype helmsman's vertical acceleration display and recording system. This low cost marinized PC based device can present acceleration historiesof any position of the boat in multiple formats on a high resolution sunlight readable display. Like an aircraft "black box", but with more memory, it can archive ...

    SBIR Phase I 1997 Department of DefenseSpecial Operations Command
  3. Miniature RF Receiving Antennas

    SBC: Delfin Systems            Topic: N/A

    The Phase I technical objective is to design a series of small receiving antennas which operate in the HF, VHF, and UHF frequency ranges (approximately 1 MHz to 1500 MHz) and then to build and test prototypes of the designs. The antennas are physically small in size and man-packable. Conventional antenna design approaches have constraints which can result in physically large structures, especially ...

    SBIR Phase II 1996 Department of DefenseSpecial Operations Command
  4. Development of Self-Repairing Concrete Containers of Radioactive Waste Using Superelastic Reinforcement

    SBC: DPD, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  5. Investigation of Molded Photovoltaic Case

    SBC: ENERGY CONVERSION DEVICES, INC.            Topic: N/A

    Portable electronic equipment, whether military or civilian, now typically contain rechargeable batteries. Often it is inconvenient or impossible to connect this equipment to conventional battery charging sources. It would be highly desirable to incorporate a built-in battery recharging source with the equipment to overcome this shortcoming. Ideally this recharging source should not take up any ex ...

    SBIR Phase II 1996 Department of DefenseSpecial Operations Command
  6. SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES

    SBC: Future Resources Associate Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  7. Very Shallow Water Mine Countermeasures Diver Sonar-Lidar Sensor

    SBC: Hendrickson & Associates            Topic: N/A

    Currently an effective diver mine imaging sensor for use in VSW mine reconnaissance does not exist. The SBIR topic requests a capability to locate and image mine targets within a 45 deg wide x 10 deg high field-of-view and to image targets with a resolution of at least 3" at a range of 20 yards. An acoustic lens sonar is a preferred technical approach. Both an acoustic lens sonar and a more compac ...

    SBIR Phase II 1996 Department of DefenseSpecial Operations Command
  8. A REMOTE LASER INSPECTION SYSTEM FOR NUCLEAR REACTOR COMPONENTS

    SBC: METROLASER, INCORPORATED            Topic: N/A

    THE DAMAGE FROM OPERATING STRESSES, AGING, AND ENVIRONMENT ACT TO MODIFY THE VIBRATIONAL MODAL PATTERNS OF NUCLEAR REACTOR COMPONENTS. WE PROPOSE TO EVALUATE THE FEASIBILITY OF APPLYING HOLOGRAPHIC TECHNIQUES FOR MONITORING AND QUANTIFYING THESE PATTERNS. THESE MEASUREMENTS COULD BE PERFORMED REMOTELY AND WITH MINIMUM DISRUPTION OF PLANT OPERATIONS. THE APPLICATION OF HOLOGRAPHY TO AUGMENT THE USE ...

    SBIR Phase I 1991 Nuclear Regulatory Commission
  9. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  10. ANALYSIS AND TRAINING OF AN ARTIFICIAL NEURAL NETWORK NETWORK NUCLEAR POWER PLANTACCIDENT DIAGNOSTIC ADVISOR

    SBC: Netrologic, Inc.            Topic: N/A

    THE OBJECTIVE OF THE PROPOSED RESEARCH IS TO DEVELOP AN ARTIFICIAL-INTELLIGENCE FAULT-DIAGNOSTIC SYSTEM THAT WILL CLASSIFY, IN REAL-TIME, NUCLEAR POWER PLANT TRANSIENTS AND PROVIDE ERROR BOUNDS ON ITS DIAGNOSES. THE GOAL IS TO DEVELOP AN ARTIFICIAL NEURAL NETWORK (ANN) PARADIGM THAT IS CAPABLE OF NOT ONLY PROVIDING A PROPER CLASSIFICATION BUT ALSO GIVING A FIGURE OF MERIT FOR ITS ANSWER. THE PROPO ...

    SBIR Phase I 1991 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government