You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Wideband Fast Switched RF Synthesizer

    SBC: SenSyTech, Inc. Imaging Group            Topic: N/A

    The current market for fast switching frequency sythesizers is growing rapidly. Most synthesizers available today will not meet the stringent requirements for switching quickly, providing spectrally pure RF outputs and minimizing physical size and cost. As part of a current SBIR program, S.T. Research has developed a wideband, fast switching synthesizer, based on the use of broadband phase-locke ...

    SBIR Phase I 1997 Department of DefenseArmy
  2. VISUAL TRANSITION ENHANCEMENT

    SBC: CARLOW INTERNATIONAL, INC.            Topic: N/A

    SINCE THE ADVENT OF ARMORED VEHICLES, SEVERAL PROBLEMS HAVE PLAGUED THEIR DESIGN WHICH DIRECTLY AFFECT THE MANNER IN WHICH THE CREW VIEWS THE BATTLEFIELD AND HOW THEY CAN SUCCESSFULLY COMPLETE THEIR MISSION. OBVIOUSLY THE NEED TO PROTECT THE CREW/EQUIPMENT IS OF PARAMOUNT IMPORTANCE. FROM A DESIGN PERSPECTIVE, THE TRADEOFF HAS ALWAYS BEEN VISION AGAINST ARMOR. SEVERAL ANALYSES CONDUCTED BY CONTRAC ...

    SBIR Phase I 1990 Department of DefenseArmy
  3. URBAN WARFARE DIGITAL DATABASE

    SBC: Mrj Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  4. UPSCALED SELF-PROPAGATING HIGH TEMPERATURE SYNTHESIS (SHS)/DYNAMIC COMPACTION PROCESSING

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  5. TUNABLE-WAVELENGTH COMPACT MILLIMETERWAVE RADAR FOR CLOUD MAPPING

    SBC: American Research Corporation of Virginia            Topic: N/A

    THERE IS A NEED OF A MM-WAVE RADAR TO RECORD THE INTERNAL STRUCTURE OF SMOKE OBSCURANT CLOUDS GENERATED DURING THE TESTS. MILLIMETER WAVE RADAR WITH 7.5M RANGE RESOLUTION AND 0.5 DEGREE ANGULAR RESOLUTION ARE REQUIRED. THE MILLIMETER WAVE RADAR TO BE DEVELOPED UNDER THIS PROPOSAL IS FREQUENCY TUNABLE IN A WIDE RANGE (10@0GHZ) AND THUS THE SPATIAL RESOLUTIONS CAN BE TUNED ALSO IN A WIDE RANGE. TYPI ...

    SBIR Phase II 1990 Department of DefenseArmy
  6. THIN FILM SENSORS TO EVALUATE CHEMICAL AND BIOLOGICAL THREATS TO ARMY STRUCTURES

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  7. The G-BAT concept: In-soil Acoustic Integrated Detection and Location of Buried Metallic and Non-metallic Targets

    SBC: K2 TECHNOLOGIES, LLC            Topic: N/A

    This proposal develops an experimental prototype employing beam shaped acoustic pulse in soil for the integrated detection and location of buried metallic and non-metallic targets. Detection of buried mines exploiting the electromagnetic spectrum has had limited success because of the intrinsic trade-off in system (pixel) resolution, search rate, signal and image processing, as well as lack of ro ...

    SBIR Phase I 1997 Department of DefenseArmy
  8. The Detection and Location of Buried Metallic and Nonmetallic Targets

    SBC: PLANNING SYSTEMS, INC.            Topic: N/A

    We have developed a new ground penetrating radar (GPR) which exploits stepped frequency technology and uses innovative spatial and temporal signal processing techniques to produce detailed, three dimensional images of buried objects. The resulting images are a significant improvement of ver images produces by conventional GPR. Our new GPR uses a pair of transmit-receive antennas and stepped freq ...

    SBIR Phase I 1996 Department of DefenseArmy
  9. TACTICAL INTELLIGENCE DATA FUSION DECISION AIDS

    SBC: Commonwealth Computer Research Inc            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  10. TACTICAL FORCES C3IEW SPACE SURVEILLANCE COUNTERMEASURES

    SBC: INFORMATION TECHNOLOGY & APPLICATIONS CO            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseArmy
US Flag An Official Website of the United States Government