You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Aim Telemetry Expert Analyst & Monitor

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase II 1996 National Aeronautics and Space Administration
  2. HIGH-TEMPERATURE FINISH FOR AMB-21 MATRIX COMPOSITES

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 National Aeronautics and Space Administration
  3. Novel Adhesives For Space Applications

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  4. AN INTERACTIVE ALGORITHM DESIGN TOOL FOR EMBEDDED MULTIPROCESSOR SYSTEMS

    SBC: ADVANCED SYSTEMS & TECHNOLOGIES INC            Topic: N/A

    THIS RESEARCH WILL ULTIMATELY PRODUCE AN INTERACTIVE ALGORITHM DESIGN TOOL FOR EMBEDDED MULTIPROCESSOR SYSTEMS. DESIGNERS WILL SPECIFY ALGORITHM STRUCTURE AS A DIRECTED GRAPH OF INTERCONNECTED NODES. THE TOOL AUTOMATICALLY PARTITIONS THESE GRAPHS INTO TASKS AND THEN ASSIGNS THESE TASKS TO PROCESSORS. THESE GROUPINGS AND ASSIGNMENTS WILL OPTIMIZE ALGORITHM PERFORMANCE (I.E., THROUGHPUT AND PROCESSI ...

    SBIR Phase I 1989 National Aeronautics and Space Administration
  5. SOFT HUB FOR BEARINGLESS ROTORS

    SBC: Advanced Technologies, Inc            Topic: N/A

    THE ROTARY WING INDUSTRY HAS STRIVED TO DEVELOP A BEARINGLESS MAIN ROTOR (BMR), HAVING NO MECHANICAL BEARINGS. ALL TRUE BMR SYSTEMS ARE LIMITED BY THE STRENGTH IN STATIC-FATIGUE LOADS VERSUS FLAPWISE FLEXIBILITY, RESULTING IN LIMITED "G" MANEUVERS FROM A HIGHLY RESPONSIVE ROTOR SYSTEM. ATI'S SOFT HUB ROTOR CONCEPT ALLOWS TILTING OF THE ROTOR DISC MOVING THE VIRTUAL HINGE INBOARD ELIMINATING THIS U ...

    SBIR Phase I 1990 National Aeronautics and Space Administration
  6. A PROPULSION SYSTEM FOR AN UPPER STAGE OF A LAUNCH VEHICLE

    SBC: Advent Engineering Services, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 National Aeronautics and Space Administration
  7. Multipurpose Upper Stage Propulsion Using High Energy Density Fuel

    SBC: Advent Engineering Services, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  8. Seven-Sensor Probes For Dusty And/Or Compressible Flows

    SBC: AEROPROBE CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  9. A Stand-Alone Sensitivity Solver For Hypersonic Design Applications

    SBC: AEROSOFT INC            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  10. LASER SPECKLE INTERFEROMETER FOR SURFACE ACOUSTIC DISPLACEMENT MEASUREMENTS

    SBC: American Research Corporation of Virginia            Topic: N/A

    ADVANCES IN REAL-TIME MEASUREMENT TECHNIQUES FOR CHARACTERIZING STRUCTURAL AND PROPULSION SYSTEM PROPERTIES REQUIRE ACCURATE MEASUREMENT OF DYNAMIC PROPERTIES IMPORTANTTO THE DESIGN OF ADVANCED AERONAUTICAL AND AEROSPACE VECHICLES. THE SPECIFIC INNOVATION ADDRESSED BY THIS PROPOSAL IS THE EMPLOYMENT OF A NON-INTRUSIVE, RUGGED OPTICAL IMAGING METHOD COMPATIBLE WITH ROUGH AND POORLY REFLECTING ADVAN ...

    SBIR Phase I 1990 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government