You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
ACCELERATED CORROSION TESTING CHAMBER FOR WHEELED VEHICLES
SBC: MATERIALS MODIFICATIONS INC Topic: N/AIN THIS PHASE I EFFORT, THE GOAL IS TO DETERMINE THE FEASIBILITY OF CONDUCTING ACCELERATED CORROSION TESTING OF VEHICLES BY SIMULATING 5-10-15 YEARS OF FIELD LIFE IN A COMPUTER CONTROLLED ENVIRONMENT SIMULATION CHAMBER. THE DIFFERENT REQUIREMENTS OF THE CHAMBER, THE TYPES OF ENVIRONMENTS PRESENT IN THE DIFFERENT GEOGRAPHICAL REGIONS, THE CORRELATION BETWEEN ACCELERATED CHAMBER TESTS AND FIELD COND ...
SBIR Phase I 1990 Department of DefenseArmy -
Advanced Microwave Camera for 3-D Imaging of Water Channels in a Porous Medium
SBC: SATIMO, INC. Topic: N/AThis advanced development program is devoted to adapting SATIMO's proprietary Microwave Camera design and the associated proprietary microwave imaging codes based on Augumented Diffraction Tomography (ADT) and the Volumetric Electric Field Integral Equation (VEFIE) to provide efficient 3-D imaging of water movement along perferred flow channels during snowmelt. The customized Microwave Camera wil ...
SBIR Phase I 1996 Department of DefenseArmy -
Affordable Sensor Technologies for Infrastructure Condition
SBC: Stratamagnetic Software, LLC Topic: N/AThe proposed Phase I project is the design and development of a wireless comprehensive sensor system for structural health assessment and monitoring. The final goal will be a system consisting of sensor modules or packages which can be permanently placed at the selected critical locations within a structure and which are powered and communicate wirelessly with a master station. The sensor module ...
SBIR Phase I 1997 Department of DefenseArmy -
A METHOD OF ANALYZING ATR SYSTEM PERFORMANCE BASED ON SHAPE DISTORTION
SBC: Signal Analytics Corp Topic: N/AALTHOUGH THE AFFECTS OF SENSOR PARAMETERS ON HUMAN RECOGNITION PERFORMANCE HAVE BEEN STUDIED EXTENSIVELY, WORK DONE TO RELATE SENSOR PARAMETERS TO AUTOMATIC TARGET RECOGNITION (ATR) SYSTEM PERFORMANCE IS STILL IN ITS INFANCY. THIS PROPOSAL OUTLINES A PROGRAM WITH THE FOLLOWING OBJECTIVES: (I) DEVELOP A COMPUTATIONAL METHOD FOR MODELING ATR SYSTEM PERFORMANCE WHICH ENJOYS THE SAME CHARACTERISTICS T ...
SBIR Phase I 1989 Department of DefenseArmy -
An Advanced Integrated Electric Wheel Motor and Hydraulic Suspension System for High-Mobility Scout Ground Vehicle
SBC: NEW GENERATION MOTORS CORP. Topic: N/AMilitary scout vehicles and commercial sports utility vehicles share the common need for advanced suspension/drive systems that offer robustness over widely varying terrain. The ultimate system for handling, ride isolation, and stability control would incorporate high efficiency electric motors independently driving the four wheels, with one on-board high-level computer for controlling the active ...
SBIR Phase I 1997 Department of DefenseArmy -
ANALYSIS AND EVALUATION OF ADVANCED DIRECTION FINDING (DF) APPROACHES
SBC: INFORMATION SYSTEMS LABORATORIES INC Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseArmy -
A Novel Non-Lethal Effects Device
SBC: Adroit Systems, Inc. Topic: N/AN/A
SBIR Phase I 1996 Department of DefenseArmy -
AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER
SBC: W Peter Trower Inc. Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
Application of Info-Geometric Instrumentation for the Interactive "Virtual" Integration of Large Scale Battlefield & TES Combined Arms Forces
SBC: Harris Technologies LLC Topic: N/AResearch associated with this Phase I Small Business Innovative Reserch proposal, and its possible Phase II follow-on, are expected to demonstrate the feasibility and practicality of use of affordable info-geometric instrumentation technology for accurately integrating real and virtual forces, crews and advanced weapons systems in combined laboratory (trainer) and field (operational maneuvering) t ...
SBIR Phase I 1993 Department of DefenseArmy -
Appurtance Attachments for Composite Systems
SBC: Witten Company, Inc. Topic: N/AThis exploratory development program is a study of existing means of attaching hardware to composite materials in general. Special attention for mounting racks, brackets, modular armor and other types of equipment and hardware on combat and tactical vehicle will be provided. These vehicles use all types and shapes of composite structure including: solid laminates, thin wall composites, pultrusion, ...
SBIR Phase I 1994 Department of DefenseArmy