You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A Novel MHD Power Generation and Energy Storage Concept for Re-Entry Vehicles
SBC: LYTEC LLC Topic: SB093014An innovate re-entry power system is proposed for development which collects the re-entry energy for a vehicle/module entering the atmosphere for LEO using an MHD power generator that is configured on the exterior surface of the vehicle nose to utilize the heated air sheath as the plasma for promoting the MHD power process. The MHD power produced is collect in an internal energy storage system tha ...
SBIR Phase I 2010 Department of DefenseDefense Advanced Research Projects Agency -
Integrated Airframe System
SBC: GLOYER-TAYLOR LABORATORIES INC Topic: SB091013Building upon the successful Phase I demonstration of the feasibility of the Blended Hybrid Laminate (BHL) technology, the Phase II effort will seek to demonstrate and validate the technology at a relevant scale. Phase II confirmation of high cryo-pressure cycle life and high structural performance will open the door to the application of the technology to future high performance rockets, such as ...
SBIR Phase II 2010 Department of DefenseDefense Advanced Research Projects Agency -
N/A
SBC: ACCURATE AUTOMATION CORPORATION Topic: N/AN/A
SBIR Phase I 2000 Department of DefenseDefense Advanced Research Projects Agency -
Enhanced Turbojet Inlet Injection
SBC: ACCURATE AUTOMATION CORPORATION Topic: N/AAccurate Automation Corporation (AAC) proposes to develop an analytical andexperimental database that demonstrates the basic feasibility of inlet injection ofoxidizer in turbojet engines for turbojet acceleration. This will enable operation ofconventional turbojets to higher Mach numbers, to higher speeds, and to higheraltitudes than they are current capable. This is a step in using the nation'si ...
SBIR Phase I 2001 Department of DefenseDefense Advanced Research Projects Agency -
Carbon Nanotube Plasma Limiter
SBC: ACCURATE AUTOMATION CORPORATION Topic: MDA06034The enabling solid state semiconductor technology in modern electronics and radar systems increases their vulnerability to the effects of high power, fast rise-time EMP, HPM, and UWB pulses. In recent years, significant advances in the technology used to produce these pulses have been made in the United States and abroad, increasing the need for effective protection against these threats. Howeve ...
SBIR Phase II 2009 Department of DefenseDefense Advanced Research Projects Agency -
DEVELOPMENT OF COATINGS FOR FIBERS INCORPORATED IN HIGH TEMPERATURE COMPOSITE MATERIALS
SBC: ANALYSIS DESIGN & DIAGNOSTICS INC Topic: N/ADARPA HAS IDENTIFIED A NEED FOR NEW AND IMPROVED TECHNIQUES FOR COATING CERAMIC FIBERS FOR SUBSEQUENT INCORPORATION INTO METALLIC, CERAMIC OR HYBRID MATRICES. AMERICAN MATRIX, INC.'S PHASE I PROGRAM ADDRESSES THE SIGNIFICANT PERFORMANCE ATTRIBUTES (DEFINED BY DARPA AS INTERFACE CHEMICAL REACTION INHIBITION, INTERFACE BOND DEVELOPMENT,AND TAILORED PROPERTIES) WITH A MULTI-FACETED COATING PROGRAM. S ...
SBIR Phase I 1988 Department of DefenseDefense Advanced Research Projects Agency -
QUANTITATIVE AND SENSITIVE PROFILING OF DOPANTS AND IMPURITIES IN COMPOUND SEMICONDUCTORS USING...
SBC: ATOM SCIENCES, INC. Topic: N/ATHE DEVELOPMENT OF AN ANALYTICAL TECHNIQUE HAVING HIGH DEPTH AND LATERAL RESOLUTION, VERY HIGH SENSITIVITY AND SELECTIVITY, VERY HIGH (>10 X12) DYNAMIC RANGE, HIGH QUANTITATION ACCURACY, AND INDEPENDENCE FROM MATRIX EFFECTS ON SURFACES AND AT INTERFACES, IS CRITICAL IN MANY AREAS OF RESEARCH, DEVELOPMENT AND PRODUCTION, ESPECIALLY FOR THE ADVANCEMENT OF ELECTRONIC AND OPTOELECTRONIC MATERIALS. ALL ...
SBIR Phase II 1992 Department of DefenseDefense Advanced Research Projects Agency -
A New Instrument for Quantitive Measurements of High-Ionization Thereshold Elements in Nanostructures
SBC: ATOM SCIENCES, INC. Topic: N/AThe objective of the project is to develop a new mass spectrometric diagnostic tool that will allow quantitative measurement on a nanometer scale of elements having a high ionization potential, such as hydrogen, carbon, nitrogen, oxygen fluorine, and phosphorous. The proposed work would extend the proven capabilities of laser resonance postionization of sputtered material to enable efficient meas ...
SBIR Phase I 1997 Department of DefenseDefense Advanced Research Projects Agency -
QUANTITATIVE AND SENSITIVE PROFILING OF DOPANTS AND IMPURITIES IN COMPOUND SEMICONDUCTORS USING...
SBC: ATOM SCIENCES, INC. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency -
Novel Photoelectric Sensing Technology for Environmental Monitoring
SBC: Concord Science & Technology, Topic: N/AMany environmental pollutants, contaminants, poisonous gases, and hazardous materials are halogen-based chemicals in which they have chlorine or its family of elements in their molecular compositions. Pollutants in this family include many common chemicals found in the defense and the civilian sectors, e.g., trichloroethylene, polychlorinated biphenyl, and chlorofluorocarbons. These chemicals are ...
SBIR Phase I 1994 Department of DefenseDefense Advanced Research Projects Agency