You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY22 is not expected to be complete until September, 2023.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
-
DEVELOPMENT OF A DYNAMIC OPERATIONAL RISK MODEL TO SUPPORT RISK MANAGEMENT OF NUCLEAR POWER PLANTS
SBC: Accident Prevention Group Topic: N/ACURRENT ACTIVITY WITHIN THE NRC AND THE NUCLEAR INDUSTRY SEEKS TO EXPLOIT THE BENEFITS OF PRA IN RISK-BASED APPROACHES TO RELIEVE REGULATORY BURDEN ON THE ECONOMICALLY THREATENED NUCLEAR POWER PLANTS. THE ACCIDENT PREVENTION GROUP HAS BEEN DEVELOPING THE CONCEPT OF AN INTEGRATED RISK MANAGEMENT PROGRAM (IRMP) TOWARD SUCH GOALS. A KEY ELEMENT OF AN IRMP IS AN "OPERATIONAL RISK MODEL" OF THE NPP THA ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
COMPUTERIZED EMERGENCY OPERATION PROCEDURES RESEARCH
SBC: Accident Prevention Group Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
AN ADAPTING FINITE ELEMENT MODEL FOR UNSATURATED POROUS MEDIA
SBC: Advanced Projects Research, Incorporated Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
DEVELOPMENT OF TOOLS FOR SAFETY ANALYSIS OF CONTROL SOFTWARE IN ADVANCED REACTORS
SBC: Advanced Systems Concepts Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
THE WORK PROPOSED IN THIS EFFORT IS DIRECTED TOWARDS DETERMINING THE CORRELATION BETWEEN OBSERVED AIRBORNE RADIOIODINE CONCENTRATIONS IN THE AUXILIARY AND FUEL HANDLING BUILDINGS AT TMI-2 FOLLOWING THE ACCIDENT IN 1979 WITH DIURNAL TEMPERATURE VARIATIONS.
SBC: Daniel & Associates Inc. Topic: N/ATHE WORK PROPOSED IN THIS EFFORT IS DIRECTED TOWARDS DETERMINING THE CORRELATION BETWEEN OBSERVED AIRBORNE RADIOIODINE CONCENTRATIONS IN THE AUXILIARY AND FUEL HANDLING BUILDINGS AT TMI-2 FOLLOWING THE ACCIDENT IN 1979 WITH DIURNAL TEMPERATURE VARIATIONS. APPROXIMATELY 5000 MEASUREMENTS WERE MADE DURING THE PERIOD APRIL-JULY, 1979 INDESIGNATED AREAS OF THE AUXILIARY/FUEL HANDLING BUILDING AND THE ...
SBIR Phase I 1985 Nuclear Regulatory Commission -
FACILITATE DEVELOPMENT AND EVALUATION OF FAULT TREES
SBC: Expert-ease Systems Topic: N/AWORKSTATION AND EXPERT SYSTEM TECHNOLOGIES HAVE A POTENTIAL OF SUBSTANTIALLY FACILITATING THE DEVELOPMENT AND EVALUATIONOF FAULT TREES. INTRODUCING A WORKSTATION PHILOSOPHY WITH AN INTERACTIVE SET OF INTEGRATED SOFTWARE TOOLS ON A LOCAL COMPUTER WILL PROMOTE IMPROVED CONTINUITY IN THE THOUGHT PROCESS DURING A FAULT TREE DEVELOPMENT. THE EXPERT SYSTEM TECHNOLOGY WILL SIMPLIFY THE WAY FAULT TREES AR ...
SBIR Phase I 1985 Nuclear Regulatory Commission -
EVAL OF RELIABILITY & USEFULNESS OF EXTERNAL-INITIATOR PRA METHODOLOGIES
SBC: Future Resources Associate Inc Topic: N/ATHE DISCIPLINE OF EXTERNAL-INITIATOR PRA ANALYSIS IS RELA- TIVELY LESS MATURE AND LESS RELIABLE THAN THE CORRESPONDING INTERNAL-INITIATORS PRA ANALYSIS. THESE RELATIVE WEAKNESSESHAVE MADE MANY DECISION-MAKERS, IN BOTH INDUSTRY AND THE NRCRELUCTANT TO USE EXTERNAL-INITIATOR PRA RESULTS. THE EXTER-NAL-INITIATOR ANALYSES HAVE BEEN CONSIDERED TOO UNCERTAIN, OR TOO CONSERVATIVE, OR SUPPORTED BY TOO LIT ...
SBIR Phase I 1988 Nuclear Regulatory Commission -
SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES
SBC: Future Resources Associate Inc Topic: N/AN/A
SBIR Phase I 1990 Nuclear Regulatory Commission -
DEVELOPMENT OF A METHODOLOGY FOR ANALYZING PRECURSORS TO EARTHQUAKE-INITIATED AND FIRE-INITIATED ACCIDENT SEQUENCES
SBC: Future Resources Associate Inc Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
SMART WATER-REACTIVE GROUTS FOR UNDERGROUND ENTOMBMENT FACILITIES
SBC: Guyer Santin, Inc. Topic: N/ATHIS PROPOSAL IS TO ADDRESS THE FEASIBILITY OF WATER-REACTIVE GROUTS AS A "SMART" MATERIAL CAPABLE OF BEING PLACED DURING CONSTRUCTION BUT NOT ACTIVATED UNTIL A THREAT EVENT OCCURS WHICH DEGRADES THE ORIGINAL WATERTIGHT INTEGRITY. WHEN SUCH DEGRADATION OCCURS, IT WILL EXPOSE THE WATER-REACTIVE GROUT TO GROUNDWATER. THIS WILL TRIGGER THE HARDENING PROCESS WHICH WILL AUTOMATICALLY AFFECT A EAL AT TH ...
SBIR Phase I 1994 Nuclear Regulatory Commission