You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
LASER ALLOYING OF PLASMA-DEPOSITED COATINGS FOR PROTECTION AGAINST ATOMIC OXYGEN
SBC: American Research Corporation of Virginia Topic: N/AN/A
SBIR Phase I 1988 Department of DefenseMissile Defense Agency -
INFRARED SENSOR AND IMAGING SYSTEM
SBC: EMPIRICAL TECHNOLOGIES CORPORATION Topic: N/AN/A
SBIR Phase I 1988 Department of DefenseMissile Defense Agency -
VALIDATION & TESTING OF THE VAM2D COMPUTER CODE
SBC: Hydrogeologic Inc. Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS
SBC: Risk Management Systems Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
OPTIMAL ENERGY MANAGEMENT FOR KINETIC ENERGY WEAPONS
SBC: BARRON ASSOCIATES, INC. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseMissile Defense Agency -
HYBRIDIZED METAL MATRIX COMPOSITES FOR PASSIVE DAMPING
SBC: CORDEC CORP. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseMissile Defense Agency -
HIGH SPECIFIC POWER/ENERGY RECHARGEABLE BATTERY CONCEPT
SBC: Innovations Solutions From Adv Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseMissile Defense Agency -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
CROSSED-FIELD WIGGLER
SBC: MISSION RESEARCH CORP. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseMissile Defense Agency -
IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER
SBC: Shonka Research Associates Topic: N/ATHE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...
SBIR Phase I 1990 Nuclear Regulatory Commission