You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY22 is not expected to be complete until September, 2023.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
-
SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES
SBC: Future Resources Associate Inc Topic: N/AN/A
SBIR Phase I 1990 Nuclear Regulatory Commission -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
EFFECT OF AGING ON RESPONSE TIME OF NUCLEAR PLANT PRESSURE SENSORS
SBC: ANALYSIS AND MEASUREMENT SERVICES CORPORATION Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
EVAL OF RELIABILITY & USEFULNESS OF EXTERNAL-INITIATOR PRA METHODOLOGIES
SBC: Future Resources Associate Inc Topic: N/ATHE DISCIPLINE OF EXTERNAL-INITIATOR PRA ANALYSIS IS RELA- TIVELY LESS MATURE AND LESS RELIABLE THAN THE CORRESPONDING INTERNAL-INITIATORS PRA ANALYSIS. THESE RELATIVE WEAKNESSESHAVE MADE MANY DECISION-MAKERS, IN BOTH INDUSTRY AND THE NRCRELUCTANT TO USE EXTERNAL-INITIATOR PRA RESULTS. THE EXTER-NAL-INITIATOR ANALYSES HAVE BEEN CONSIDERED TOO UNCERTAIN, OR TOO CONSERVATIVE, OR SUPPORTED BY TOO LIT ...
SBIR Phase I 1988 Nuclear Regulatory Commission -
DEV OF A LARGE CROSS SECTIONAL AREA SELF-POWERED DETECTOR
SBC: K E M P CORP Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
IMPROVED MODEL FOR PREDICTING J-R CURVES FROM CHARPY DATA
SBC: Modeling & Computing Services Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS
SBC: Risk Management Systems Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission