You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Compact Laser Shearography System for Crack Detection
SBC: Laser Technology Inc. Topic: 05FH1Laser Technology Inc. (LTI) proposes a Phase II SBIR research project to further develop a Compact Shearography System, Analysis Method and Software for micro-crack detection in concrete. There is an urgent need to detect and characterize fine cracks in concrete that form because of various damage mechanisms including alkali-silicate reaction, delayed ettringite formation or frost damage. Fine s ...
SBIR Phase II 2008 Department of Transportation -
Ultra Portable Ride Quality Meter
SBC: DFUZION, INC. Topic: 06FR3The Ultra Portable Ride Quality Meter (UPRQM) is a cost-effective, flexible tool that can evolve (with minimal effort) as new GPS and accelerometer devices become commercially available. Each generation of these sensor devices is more responsive, more sensitive, and more accurate than the last generation. The time between generations is also decreasing such that accelerometer and GPS technology ...
SBIR Phase II 2008 Department of Transportation -
Low Cost Transverse Rail Defect Detector
SBC: Mide Technology Corporation Topic: 02FR1Development of the basic EMAT based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstratable version of a 2-rail detection system with automated signal interpertation. The objectives of this work are to: a. Further develop the system into a functioning 2-rail detection system, as ori ...
SBIR Phase II 2008 Department of Transportation -
Innovative Multi-cellular Pultruded Composite Guardrail
SBC: Creative Pultrusions, Inc Topic: N/AN/A
SBIR Phase II 2001 Department of Transportation