You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. IMAGINE: Imagery Management through Agile, Geo-Interactive, Natural Embodiment

    SBC: APTIMA INC            Topic: NGA11002

    Overhead imagery analysts employ computer-based software as Electronic Light Tables (ELTs), to perform detailed analysis of aerial images in search of elements of interest. Conventional display design for ELT software requires analysts to take their eyes away from the image they are analyzing to perform routine functions. This interaction overhead typically leads to losses in visual momentum and i ...

    SBIR Phase I 2011 Department of DefenseNational Geospatial-Intelligence Agency
  2. Lithium-Ion (Li-ion) and Lithium-ion Polymer (Li-polymer) Battery Safety

    SBC: PHYSICAL SCIENCES INC.            Topic: OSD09EP1

    Physical Sciences, Inc. (PSI) has demonstrated that electroactive polymer coatings (EAP) may be applied to the surface of the cathode materials for lithium-ion batteries to protect against catastrophic cell failure. These EAP coatings form an electrochemical"switch"that can prevent catastrophic failure in lithium-ion batteries by reversibly changing from a conductor to an insulator on overdischarg ...

    SBIR Phase II 2011 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government