You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Integrated Risk Management and Quality Assurance

    SBC: Accident Prevention Group            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  2. Extending the Dynamic Flowgraph Methodology (DFM) to Model Human Performance and Team Effects

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  3. Development of a Performance Assessment Process Controller

    SBC: Innovative Tech. Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  4. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  5. A REMOTE LASER INSPECTION SYSTEM FOR NUCLEAR REACTOR COMPONENTS

    SBC: METROLASER, INCORPORATED            Topic: N/A

    THE DAMAGE FROM OPERATING STRESSES, AGING, AND ENVIRONMENT ACT TO MODIFY THE VIBRATIONAL MODAL PATTERNS OF NUCLEAR REACTOR COMPONENTS. WE PROPOSE TO EVALUATE THE FEASIBILITY OF APPLYING HOLOGRAPHIC TECHNIQUES FOR MONITORING AND QUANTIFYING THESE PATTERNS. THESE MEASUREMENTS COULD BE PERFORMED REMOTELY AND WITH MINIMUM DISRUPTION OF PLANT OPERATIONS. THE APPLICATION OF HOLOGRAPHY TO AUGMENT THE USE ...

    SBIR Phase I 1991 Nuclear Regulatory Commission
  6. ANALYSIS AND TRAINING OF AN ARTIFICIAL NEURAL NETWORK NETWORK NUCLEAR POWER PLANTACCIDENT DIAGNOSTIC ADVISOR

    SBC: Netrologic, Inc.            Topic: N/A

    THE OBJECTIVE OF THE PROPOSED RESEARCH IS TO DEVELOP AN ARTIFICIAL-INTELLIGENCE FAULT-DIAGNOSTIC SYSTEM THAT WILL CLASSIFY, IN REAL-TIME, NUCLEAR POWER PLANT TRANSIENTS AND PROVIDE ERROR BOUNDS ON ITS DIAGNOSES. THE GOAL IS TO DEVELOP AN ARTIFICIAL NEURAL NETWORK (ANN) PARADIGM THAT IS CAPABLE OF NOT ONLY PROVIDING A PROPER CLASSIFICATION BUT ALSO GIVING A FIGURE OF MERIT FOR ITS ANSWER. THE PROPO ...

    SBIR Phase I 1991 Nuclear Regulatory Commission
  7. HIGH SENSITIVITY LANDFILL MONITOR

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1991 Nuclear Regulatory Commission
  8. SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES

    SBC: Future Resources Associate Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  9. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  10. IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER

    SBC: Shonka Research Associates            Topic: N/A

    THE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government