You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Accelerating Cavities for a Relativistic Klystron Two-Beam Accelerator
SBC: Fm Technologies Inc Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
A DIODE LASER FREQUENCY STANDARD USING VELOCITY MODULATION
SBC: SOUTHWEST SCIENCES INC Topic: N/ATHIS PROJECT WILL DEVELOP A FREQUENCY STANDARD FOR THE URANIUM-STOMIC VAPOR LASER ISOTOPE SEPARATION (U-AVLIS) PROCESS USING A VISIBLE DIODE LASER LOCKED TO AN ATOMIC RESONANCE. A KEY FEATURE IS THE USE OF THE VELOCITY MODULATION METHOD TO PROVIDE A HIGH SIGNAL/NOISE LOCKING DISCRIMINANT WITHOUT THE NEED TO MODULATE THE LASER, AND WITH THE HIGH POWERS FOR SUB-DOPPLER EFFECTS. PHASE I WILL PRODUCE ...
SBIR Phase I 1993 Department of Energy -
ADVANCED ULTRASONIC METHODS FOR THE NONDESTRUCTIVE EVALUATION OF BOND QUALITY IN BRAZED COMPOSITE-METAL JOINTS
SBC: KARTA TECHNOLOGIES Topic: N/AN/A
SBIR Phase I 1993 Department of Energy -
Advanced Water Sensor for Unmanned Aerial Vehicles
SBC: SOUTHWEST SCIENCES INC Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
A FEASIBILITY STUDY FOR A 5-MW, 300-GHZ QUASI-OPTICAL GYROTRON
SBC: PHYRE TECHNOLOGIES, INC. Topic: N/AN/A
SBIR Phase I 1987 Department of Energy -
A FEASIBILITY STUDY FOR A SEISMIC EARLY WARNING SYSTEM FOR NUCLEAR POWER PLANT SHUTDOWN
SBC: ENSCO Inc Topic: N/AA FEASIBILITY STUDY WILL BE CONDUCTED OF A SEISMIC SCRAM-PROCESSING SYSTEM IN WHICH P WAVES FROM LARGE EARTHQUAKES ARE DETECTED AND ANALYZED IN TIME TO INITIATE A NUCLEAR POWER PLANT CORE SHUTDOWN BEFORE THE ARRIVAL OF LARGE, DAMAGING SHEAR WAVE PHASES. A PROTOTYPE SEISMIC SCRAM-MONITORING SYSTEM WILL BE DESIGNED AND IMPLEMENTED ON A SUN 3/160 ENGINEERING WORKSTATION. IN THE PROPOSED SYSTEM, SEISM ...
SBIR Phase I 1987 Department of Energy -
A FRAMEWORK FOR A GENERAL PURPOSE INTELLIGENT CONTROL SYSTEM FOR PARTICLE ACCELERATORS
SBC: Vista Control Systems, Inc. Topic: N/AN/A
SBIR Phase I 1994 Department of Energy -
A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.
SBC: Eda Consultants Topic: N/ATHE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...
SBIR Phase I 1987 Nuclear Regulatory Commission -
A GEOSTATISTICAL ANALYSIS OF CROSSBOREHOLE SEISMIC DATA FOR RESERVOIR CHARACTERIZATION
SBC: Justice Associates Inc. Topic: N/AIMPROVED MANAGEMENT OF HYDROCARBON RESERVOIRS MAY BE THE MOST IMPORTANT KEY TO MAINTAINING OR EXPANDING THE PETROLEUM/NATURAL GAS PRODUCTION CAPABILITY OF THE U.S. IN THE WORLD MARKET. NEW INTERWELL SEISMIC IMAGING OF THE DISTRIBUTION OF RESERVOIR DESCRIPTION, SIMULATION, AND MANAGEMENT. THIS TECHNOLOGY OFFERS ONE OF THE FEW MEANS AVIALABLE TODAY FOR EVALUATING THE STATE OF THE RESERVOIR BETWEEN S ...
SBIR Phase I 1993 Department of Energy -
A 34 GHz High-Power Micro-Pulse Klystron
SBC: Fm Technologies Inc Topic: N/A161 A 34 GHzHigh-Power Micro-Pulse Klystron--FM Technologies, Inc., 10529-B Braddock Road, Fairfax, VA 22032-2236; (703) 425-5111 Dr. Frederick M. Mako, Principal Investigator Dr. Frederick M. Mako, Business Official DOE Grant No. DE-FG02-97ER82374 Amount: $75,000 High-current pulses of electrons are widely used in injector systems for electron accelerators, such as industrial linacs, as well ...
SBIR Phase I 1997 Department of Energy