List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. DETECTION OF ACID RAIN POLLUTANTS USING INFRARED LASERS PRODUCED BY STIMULATED ELECTRON RAMAN SCATTERING

    SBC: Comstock Inc            Topic: N/A

    THIS PROJECT WILL ESTABLISH THE POTENTIAL FOR RAPID RESPONSE, HIGH RESOLUTION DETECTION AND CHARACTERIZATION OF INFRARED (IR) ACTIVE POLLUTANT MOLECULES, SUCH AS S02, N0, AND N02. MINIATURE OPTICAL HEAT PIPES WILL BE CONSTRUCTED AND OPTIMIZED FOR THE GENERATION OF TUNABLE IR LASER LIGHT BY MEANS OF STIMULATED ELECTRON RAMAN SCATTERING (SERS). THE HEAT PIPES WILL USE ALKALI METAL VAPORS AT PRESSURE ...

    SBIR Phase II 1990 Department of Energy
  2. "MAPPING BORON LOCATION IN CELLS USING SOFT X-RAY EMISSION SPECTROSCOPY".

    SBC: Consultec Scientific            Topic: N/A

    THIS PROJECT WILL RESULT IN THE DEVELOPMENT OF A NEW TECHNOLOGY FOR MEASURING THE QUANTITY AND LOCATION, WITH SUBMICRON RESOLUTION, OF BORON IN BIOLOGICAL CELLS IN SUPPORT OF THE BORON NEUTRON CAPTURE THERAPY (BNCT) PROGRAM. THIS PROJECT THUS ADDRESSES THE MAJOR UNSOLVED TECHNICAL ISSUE IMPACTING BNCT CLINICAL EFFICACY. BNCT IS APROMISING RADIATION THERAPY IN WHICH NEUTRONS ARE USED TO ACTIVATE BO ...

    SBIR Phase I 1990 Department of Energy
  3. SSC HIGH HEAD LIQUID HELIUM PUMP

    SBC: Cryogenic Technical            Topic: N/A

    THIS PROPOSAL DESCRIBES A LIQUID HELIUM PUMP DESIGNED TO MEET REQUIREMENTS FOR LIQUID HELIUM CIRCULATION THROUGH SUPERCONDUCTING SUPER COLLIDER MAGNET STRINGS. THE PUMP IS A FOUR-CHAMBER POSITIVE DISPLACEMENT NUTATING MACHINE WITH LOW NPSH. IT IS CAPABLE OF PRODUCING HIGH HEADS WITH LITTLE IMPACT ON EFFICIENCY FOR TURN DOWN RATIOS AS HIGH AS 5 TO 1. THE FOUR-CHAMBER DESIGN PROVIDES OUTLET FLOW WIT ...

    SBIR Phase I 1990 Department of Energy
  4. INITIAL EXPLORATION OF AMORPHOUS AND POLYCRYSTALLINE SI THIN FILM TRANSISTORS AS PREAMPLIFIERS FOR PARTICLE DETECTOR APPLICATIONS

    SBC: Glasstech Solar Inc            Topic: N/A

    AMORPHOUS SILICON (A-SI) THIN FILM PARTICLE DETECTOR, AS AN EMERGING PARTICLE DETECTION DEVICE, WITH EXCELLENT RADIATIONHARDNESS AND LOWER PRODUCTION COST THAN CRYSTALLINE SILICON (C-SI), HAS ATTRACTED MORE ATTENTION AND IS UNDER ACTIVE DEVELOPMENT WITH PROMISING PERFORMANCE IMPROVEMENTS. DEVELOPING THIN FILM TRANSISTORS (TFT) WHICH CAN BE FABRICATED ON THE SAME SUBSTRATE OF A-SI THIN FILM PARTICL ...

    SBIR Phase I 1990 Department of Energy
  5. METHOD OF PRODUCING CARBON CLUSTERS

    SBC: TDA Research, Inc.            Topic: N/A

    NANOMETER-SCALE AGGREGATES OF ORDER 10 TO 100 ATOMS, KNOWN AS CLUSTERS, HAVE GENERATED A GREAT DEAL OF INTEREST IN RECENT YEARS DUE TO THEIR POTENTIAL APPLICATIONS AS CATALYSTS, OPTICAL MATERIALS AND ELECTRONIC MATERIALS. STABLE CLUSTERS OF CARBON HAVE BEEN OBSERVED AND A UNIQUE SPHERICAL STRUCTURE SIMILAR TO THAT OF A SOCCER BALL HAS BEEN PROPOSED FOR THEM. CARBON CLUSTERS ARE GIVEN THE NAME FULL ...

    SBIR Phase I 1990 Department of Energy
  6. HIGH TEMPERATURE HYDROGEN SULFIDE REMOVAL

    SBC: TDA Research, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
  7. AN ADVANCED ROBOTIC MANIPULATOR FOR THE INTEGRAL FAST REACTOR FUEL CYCLE FACILITY

    SBC: Remotec Inc.            Topic: N/A

    DEMONSTRATION TESTING OF ADVANCED PROCESS EQUIPMENT IS EXPECTED TO CONFIRM THE FEASIBILITY OF THE INTEGRAL FAST REACTOR (IFR) FUEL CYCLE PROCESS AT THE HOT FUEL EXAMINATION FACILITY - SOUTH (HFEF-S) ON THE ARGONNE-WEST SITE IN IDAHO. TEST RESULTS WILL BE INCORPORATED INTO THE DESIGN OF A COMMERCIAL IFR FUEL CYCLE FACILITY. THIS PROJECT CONTRIBUTES TO DEVELOPMENT OF A CONCEPTUAL DESIGN FOR AN ADVAN ...

    SBIR Phase II 1990 Department of Energy
  8. AN IN-VESSEL AND EX-VESSEL SMALL VOLUME REMOTE MAINTENANCE SYSTEM FOR THE COMPACT IGNITION TOKAMAK

    SBC: Telerobotics International,            Topic: N/A

    REMOTE MAINTENANCE OF THE COMPACT IGNITION TOKAMAK (CIT) POSES FORMIDABLE CHALLENGES BECAUSE OF ITS INTERNAL DIMENSIONAL CONSTRAINTS, DIVERSITY OF MAINTENANCE OPERATIONS, AND GEOMETRICALLY INTRICATE ARRANGEMENT OF EXTERNAL SERVICE EQUIPMENT. THESE CHALLENGES MUST BE ADDRESSED TO SUPPORT FUTURE "HOT" OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) CIT. PHASE I INTRODUCES A SINGLE SOLUTI ...

    SBIR Phase II 1990 Department of Energy

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government